What is Developing? Open the mapMap

Environmental approval grantedIndustry · Raigarh, Chhattisgarh

Greenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron (2,31,000 TPA), MS Billets (2,04,000 MTPA), Rolling Mill (I , 98,000 TPA) with Captive Power Plant (24 MW) by M/s. Saar Steel & Power Private Limited

Greenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron (2,31,000 TPA), MS Billets (2,04,000 MTPA), Rolling Mill (I , 98,000 TPA) with Captive Power Plant (24 MW) by M/s. Saar Steel & Power Private Limited is an approved industrial project in Chaple, Kharsia, Raigarh, Chhattisgarh. The site covers 50.1 acres. Its stated project cost is ₹385 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Sept 2023).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron (2,31,000 TPA), MS Billets (2,04,000 MTPA), Rolling Mill (I , 98,000 TPA) with Captive Power Plant (24 MW) by M/s. Saar Steel & Power Private Limited is an approved industrial project in Chaple, Kharsia, Raigarh, Chhattisgarh. The site covers 50.1 acres.

Who is building it?

The applicant is M/S Saar Steel & Power PVT LTD.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Sept 2023), as of 27 Nov 2026.

Where is it?

In Chaple, Kharsia, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹385 crore and a site of 50.1 acres.

When was it filed?

The application was filed on 14 Jul 2023.

Project details

Official titleGreenfield Project of Iron Ore Pelletization Plant (9,00,000 TPA), Sponge Iron (2,31,000 TPA), MS Billets (2,04,000 MTPA), Rolling Mill (I , 98,000 TPA) with Captive Power Plant (24 MW) located at Village- Kunkuni (Near ROB Railway Station), Tehsil- Kharsia, District-Raigarh, Chhattisgarh by M/s. Saar Steel & Power Private Limited
StatusEnvironmental approval granted
Status since13 Sept 2023
Application filed14 Jul 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantM/S Saar Steel & Power PVT LTD
Land area50.1 acres (20.3 ha)
Project cost₹385 crore
Village / localityChaple
Taluk / tehsilKharsia
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00778

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50.1 acres, this one is smaller than 60% of them.

23 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chaple, Kharsia, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M/S Saar Steel & Power PVT LTD in Raigarh

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.