What is Developing? Open the mapMap

WithdrawnIndustry · Raigarh, Chhattisgarh

Expansion of existing Sponge Iron from 120000TPA to 168000TPA, Billet from 100000TPA to 140000TPA, Rolled products from 95000TPA to 133000TPA, Captive Power Plant from 20MW to 28MW (WHRB-8 to 12MW, FBC-12 to 16MW) and Ferro Alloys 30000TPA Max.(No increase in Ferro Alloys Capacity) under 7(ii)(a) for 20% increase in Phase-I & 20% increase in Phase-II(Total increase of 40% capacity than sanctioned in existing EC) by Sky Alloys & Power Ltd

Expansion of existing Sponge Iron from 120000TPA to 168000TPA, Billet from 100000TPA to 140000TPA, Rolled products from 95000TPA to 133000TPA, Captive Power Plant from 20MW to 28MW (WHRB-8 to 12MW, FBC-12 to 16MW) and Ferro Alloys 30000TPA Max.(No increase in Ferro Alloys Capacity) under 7(ii)(a) for 20% increase in Phase-I & 20% increase in Phase-II(Total increase of 40% capacity than sanctioned in existing EC) by Sky Alloys & Power Ltd is a withdrawn industrial project in Temtema, Kharsia, Raigarh, Chhattisgarh. The site covers 43.9 acres. Its stated project cost is ₹340.7 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 1 Sept 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing Sponge Iron from 120000TPA to 168000TPA, Billet from 100000TPA to 140000TPA, Rolled products from 95000TPA to 133000TPA, Captive Power Plant from 20MW to 28MW (WHRB-8 to 12MW, FBC-12 to 16MW) and Ferro Alloys 30000TPA Max.(No increase in Ferro Alloys Capacity) under 7(ii)(a) for 20% increase in Phase-I & 20% increase in Phase-II(Total increase of 40% capacity than sanctioned in existing EC) by Sky Alloys & Power Ltd is a withdrawn industrial project in Temtema, Kharsia, Raigarh, Chhattisgarh. The site covers 43.9 acres.

Who is building it?

The applicant is Sky Alloys and Power Limited.

Has it been approved?

No. The application was withdrawn on 1 Sept 2025, so it is no longer under consideration.

Where is it?

In Temtema, Kharsia, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹340.7 crore and a site of 43.9 acres.

When was it filed?

The application was filed on 1 Sept 2025.

Project details

Official titleExpansion of existing Sponge Iron from 120000TPA to 168000TPA, Billet from 100000TPA to 140000TPA, Rolled products from 95000TPA to 133000TPA, Captive Power Plant from 20MW to 28MW (WHRB-8 to 12MW, FBC-12 to 16MW) and Ferro Alloys 30000TPA Max.(No increase in Ferro Alloys Capacity) under 7(ii)(a) for 20% increase in Phase-I & 20% increase in Phase-II(Total increase of 40% capacity than sanctioned in existing EC) by Sky Alloys & Power Ltd at Vil. Temtema Tehsil Kharsia Dist. Raigarh Chhattisgarh
StatusWithdrawn
Status since1 Sept 2025
Application filed1 Sept 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSky Alloys and Power Limited
Land area43.9 acres (17.8 ha)
Project cost₹340.7 crore
Village / localityTemtema
Taluk / tehsilKharsia
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02684

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 43.9 acres, this one is smaller than 65% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Temtema, Kharsia, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sky Alloys and Power Limited in Raigarh

All 4 Sky Alloys and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.