Project details
| Official title | KORBA POWER LIMITED Proposed for Transfer of EC (Change in Name) from Lanco Amarkantak Power Limited to "Korba Power Limited" in Environment Clearance (EC) of 2x300 MW coal based Amarkantak Thermal Power Plant at Pathadi Village Tehsil & District Korba, Chhattisgarh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Jan 2025 |
| Application filed | 4 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Adani Power Limited |
| Land area | 635.6 acres (257.2 ha) |
| Project cost | ₹2,400 crore |
| Village / locality | Patadhi |
| Taluk / tehsil | Korba |
| District | Korba |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00962 |
In context
27 applications in Korba since January 2022 are in the same category (Power): 10 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 635.6 acres, this one is smaller than 59% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patadhi, Korba, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of the 2x300 MW (Phase-I, Operational) and 2x660 MW (Phase-II, under… — environmental approval granted, 400 m away
- Revival of Environment Clearance (as more than 75% of TPP construction… — environmental approval granted, 400 m away
- Revival of Environment Clearance (as more than 75% of TPP construction… — environmental approval granted, 400 m away
- Revival of Environment Clearance (as more than 75% of TPP construction… — cleared for impact study, 400 m away
- Expansion of the 2x300 MW (Phase-I, Operational) and 2x660 MW (Phase-II, under… — cleared for impact study, 400 m away
- Gram Tarda for River Bed Mining of Sand of area 4 hectares — environmental approval granted, 3.7 km away
- River Bed Sand Mine - (Katbitla Sand Quarry ) — lapsed, 3.8 km away
- River Bed Sand Mine - (Katbitla Sand Quarry ) — environmental approval granted, 3.8 km away
More from Adani Power Limited in Korba
- Expansion of the 2x300 MW (Phase-I, Operational) and 2x660 MW (Phase-II, under… — environmental approval granted
- Expansion of the 2x300 MW (Phase-I, Operational) and 2x660 MW (Phase-II, under… — cleared for impact study
- Revival of Environment Clearance (as more than 75% of TPP construction… — environmental approval granted
- Revival of Environment Clearance (as more than 75% of TPP construction… — environmental approval granted
- Revival of Environment Clearance (as more than 75% of TPP construction… — cleared for impact study
6 Adani Power projects in Korba
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.