What is Developing? Open the mapMap

Cleared for impact studyIndustry · Baloda Bazar, Chhattisgarh

Greenfield Steel Plant comprising of DRI Kilns (Sponge Iron - 3,63,000 TPA), Induction Furnaces with matching LRF & CCM (Hot Billets / Billets / Ingots – 3,46,500 TPA), Rolling Mill (TMT bars / Wire Rod) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Rolling Mill (Structural Mill) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Coal Gasifier – 2 x 1500 NM3/Hr

Greenfield Steel Plant comprising of DRI Kilns (Sponge Iron - 3,63,000 TPA), Induction Furnaces with matching LRF & CCM (Hot Billets / Billets / Ingots – 3,46,500 TPA), Rolling Mill (TMT bars / Wire Rod) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Rolling Mill (Structural Mill) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Coal Gasifier – 2 x 1500 NM3/Hr is a proposed industrial project in Kukrachunda (Siabandha), Simga, Baloda Bazar, Chhattisgarh. The site covers 265.1 acres. Its stated project cost is ₹673.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Nov 2024).

See it on the live map All projects in Baloda Bazar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEstablishment of Greenfield Steel Plant comprising of DRI Kilns (Sponge Iron - 3,63,000 TPA), Induction Furnaces with matching LRF & CCM (Hot Billets / Billets / Ingots – 3,46,500 TPA), Rolling Mill (TMT bars / Wire Rod) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Rolling Mill (Structural Mill) (85% Hot charging with Hot Billets and remaining 15% through RHF with Producer Gas as fuel – 1,65,000 TPA), Coal Gasifier – 2 x 1500 NM3/Hr
StatusCleared for impact study
Status since8 Nov 2024
Application filed2 Nov 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMax Steel and Power Private Limited
Land area265.1 acres (107.3 ha)
Project cost₹673.8 crore
Village / localityKukrachunda (Siabandha)
Taluk / tehsilSimga
DistrictBaloda Bazar
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01059

In context

31 applications in Baloda Bazar since January 2022 are in the same category (Industry): 21 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 265.1 acres, this one is larger than 52% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kukrachunda (Siabandha), Simga, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Max Steel and Power Private Limited in Baloda Bazar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.