Quick answers
What is this project?
Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron 231000 TPA (350 TPD x 2 Nos.); SAF 9 MVA X 3 Nos. to produce Ferro Alloy (SiMn - 51000 TPA and/or FeMn - 64000 TPA and/or FeSi - 28000 TPA and/or Pig Iron 102000 TPA, Captive Power of 25 MW (16 MW through WHRB & 9 MW through AFBC); and Fly Ash Bricks 37,500 TPA is a proposed industrial project in Joratarai, Rajnandgaon, Chhattisgarh. The site covers 31.2 acres.
Who is building it?
The applicant is Sdrm Metaliks Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jun 2024), as of 27 Nov 2026.
Where is it?
In Joratarai, Rajnandgaon, Chhattisgarh.
How big is it?
It has a stated cost of ₹195.8 crore and a site of 31.2 acres.
When was it filed?
The application was filed on 18 Jun 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron 231000 TPA…
Project details
| Official title | Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron 231000 TPA (350 TPD x 2 Nos.); SAF 9 MVA X 3 Nos. to produce Ferro Alloy (SiMn - 51000 TPA and/or FeMn - 64000 TPA and/or FeSi - 28000 TPA and/or Pig Iron 102000 TPA, Captive Power of 25 MW (16 MW through WHRB & 9 MW through AFBC); and Fly Ash Bricks 37,500 TPA at Village - Joratarai, Tehsil and District - Rajnandgaon (C.G.) – 491 441 by M/s. SDRM Metaliks Private Limited (Env. Consultant: Anacon Laboratories Pvt. Ltd.) |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Jun 2024 |
| Application filed | 18 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sdrm Metaliks Private Limited |
| Land area | 31.2 acres (12.6 ha) |
| Project cost | ₹195.8 crore |
| Village / locality | Joratarai |
| Taluk / tehsil | Rajnandgaon |
| District | Rajnandgaon |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01062 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Feb 2026 | Environmental approval granted | 31.2 acres | ₹195.8 crore |
| New project filed 12 Nov 2025 | Returned to applicant | 31.2 acres | ₹195.8 crore |
| Early planning filed 18 Jun 2024 (this page) | Cleared for impact study | 31.2 acres | ₹195.8 crore |
In context
20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 31.2 acres, this one is smaller than 80% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Joratarai, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — environmental approval granted, 0 m away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — returned to applicant, 0 m away
- Expansion of Steel Plant and Regularization of partly constructed Iron Ore… — more information requested, 1 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 1 km away
- Proposed "increase in Production Capacity of Existing Dri Plant of 2 X 350 Tpd… — initial checks, 1 km away
- Expansion of Integrated Steel Plant From 0.4785 Mtpa to 0.9285 Mtpa Finished… — under environmental review, 1.1 km away
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — environmental approval granted, 1.1 km away
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — cleared for impact study, 1.1 km away
All 3 Sdrm Metaliks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.