What is Developing? Open the mapMap

Cleared for impact studyIndustry · Rajnandgaon, Chhattisgarh

Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished steel products (0.466 MTPA to 2.012 MTPA crude steel) and area expansion from 38.68 Ha to 84.021 Ha in Villages Kopedih and Anjora, Tehsil & District Rajnandgaon, Chhattisgarh of M/s Kalyani Ispat Limited

Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished steel products (0.466 MTPA to 2.012 MTPA crude steel) and area expansion from 38.68 Ha to 84.021 Ha in Villages Kopedih and Anjora, Tehsil & District Rajnandgaon, Chhattisgarh of M/s Kalyani Ispat Limited is a proposed industrial project in Anjora, Rajnandgaon, Chhattisgarh. The site covers 207.6 acres. Its stated project cost is ₹6,753 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Apr 2026).

See it on the live map All projects in Rajnandgaon

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished steel products (0.466 MTPA to 2.012 MTPA crude steel) and area expansion from 38.68 Ha to 84.021 Ha in Villages Kopedih and Anjora, Tehsil & District Rajnandgaon, Chhattisgarh of M/s Kalyani Ispat Limited is a proposed industrial project in Anjora, Rajnandgaon, Chhattisgarh. The site covers 207.6 acres.

Who is building it?

The applicant is Kalyani Ispat Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Apr 2026), as of 27 Nov 2026.

Where is it?

In Anjora, Rajnandgaon, Chhattisgarh.

How big is it?

It has a stated cost of ₹6,753 crore and a site of 207.6 acres.

When was it filed?

The application was filed on 4 Dec 2024.

Project details

StatusCleared for impact study
Status since20 Apr 2026
Application filed4 Dec 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKalyani Ispat Limited
Land area207.6 acres (84 ha)
Project cost₹6,753 crore
Village / localityAnjora
Taluk / tehsilRajnandgaon
DistrictRajnandgaon
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01116

In context

20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 207.6 acres, this one is larger than 60% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Anjora, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kalyani Ispat Limited in Rajnandgaon

All 3 Kalyani Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.