Quick answers
What is this project?
Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished steel products (0.466 MTPA to 2.012 MTPA crude steel) and area expansion from 38.68 Ha to 84.021 Ha in Villages Kopedih and Anjora, Tehsil & District Rajnandgaon, Chhattisgarh of M/s Kalyani Ispat Limited is a proposed industrial project in Anjora, Rajnandgaon, Chhattisgarh. The site covers 207.6 acres.
Who is building it?
The applicant is Kalyani Ispat Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Apr 2026), as of 27 Nov 2026.
Where is it?
In Anjora, Rajnandgaon, Chhattisgarh.
How big is it?
It has a stated cost of ₹6,753 crore and a site of 207.6 acres.
When was it filed?
The application was filed on 4 Dec 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Apr 2026 |
| Application filed | 4 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Kalyani Ispat Limited |
| Land area | 207.6 acres (84 ha) |
| Project cost | ₹6,753 crore |
| Village / locality | Anjora |
| Taluk / tehsil | Rajnandgaon |
| District | Rajnandgaon |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01116 |
In context
20 applications in Rajnandgaon since January 2022 are in the same category (Industry): 12 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 207.6 acres, this one is larger than 60% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjora, Rajnandgaon, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Steel Plant From 0.4785 Mtpa to 0.9285 Mtpa Finished… — under environmental review, 0 m away
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — environmental approval granted, 0 m away
- Greenfield steel plant comprising of DRI Kilns (2,31,000 TPA), Induction… — cleared for impact study, 350 m away
- M/s. SMS WATERGRACE ENVIROPROTECT PRIVATE LIMITED proposed a new CBMWTF at… — lapsed, 700 m away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — environmental approval granted, 1.1 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — returned to applicant, 1.1 km away
- Greenfield project for proposed DRI based Steel plant to Produce Sponge Iron… — cleared for impact study, 1.1 km away
- Expansion of Steel Plant and Regularization of partly constructed Iron Ore… — more information requested, 2 km away
More from Kalyani Ispat Limited in Rajnandgaon
- Expansion of Integrated Steel Plant from 0.4785 MTPA to 0.9285 MTPA finished… — environmental approval granted
- Greenfield project of Sponge Iron 660000 TPA; MS Billets 465696 TPA; Rerolled… — environmental approval granted
All 3 Kalyani Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.