What is Developing? Open the mapMap

Initial checksIndustry · Bametara, Chhattisgarh

Integration of Contiguous Land Area With No Change in Configuration of Plant and No Change in Products Or Production Capacity Than Granted in Existing Ec

Integration of Contiguous Land Area With No Change in Configuration of Plant and No Change in Products Or Production Capacity Than Granted in Existing Ec is a proposed industrial project in Boriya, Berla, Bametara, Chhattisgarh. The site covers 49.9 acres. Its stated project cost is ₹265.1 crore. As of 27 Nov 2026, its status is “Initial checks” (since 11 Dec 2024).

See it on the live map All projects in Bametara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Integration of Contiguous Land Area With No Change in Configuration of Plant and No Change in Products Or Production Capacity Than Granted in Existing Ec is a proposed industrial project in Boriya, Berla, Bametara, Chhattisgarh. The site covers 49.9 acres.

Who is building it?

The applicant is Neerganga Ispat Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Boriya, Berla, Bametara, Chhattisgarh.

How big is it?

It has a stated cost of ₹265.1 crore and a site of 49.9 acres.

When was it filed?

The application was filed on 11 Dec 2024.

Project details

StatusInitial checks
Status since11 Dec 2024
Application filed11 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantNeerganga Ispat Private Limited
Land area49.9 acres (20.2 ha)
Project cost₹265.1 crore
Village / localityBoriya
Taluk / tehsilBerla
DistrictBametara
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01158

In context

24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 49.9 acres, this one is larger than 58% of them.

18 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Boriya, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Neerganga Ispat Private Limited in Bametara

All 7 Neerganga Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.