What is this project?
Proposed Greenfield Project for installation of manufacturing facilities for production of: Sponge Iron 2,31,000 TPA; Mild Steel Billet 2,32,848 TPA; Rerolled Steel Products through Hot Charging and through Reheating Furnace 2,25,863 TPA; Captive Power plant 25 MW (16 MW through WHRB and 9 MW through AFBC) and Fly Ash Bricks of 34,600 TPA by M/s. Neerganga Ispat Pvt. Ltd is a proposed industrial project in Boriya, Berla, Bametara, Chhattisgarh. The site covers 47.3 acres.
Who is building it?
The applicant is Neerganga Ispat Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Boriya, Berla, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹265.1 crore and a site of 47.3 acres.
When was it filed?
The application was filed on 27 Sept 2025.
One of 6 filings for this project. The project's main page, with every filing and where each stands: Proposed Greenfield Project for installation of manufacturing facilities for production…
Project details
| Official title | Proposed Greenfield Project for installation of manufacturing facilities for production of: Sponge Iron 2,31,000 TPA; Mild Steel Billet 2,32,848 TPA; Rerolled Steel Products through Hot Charging and through Reheating Furnace 2,25,863 TPA; Captive Power plant 25 MW (16 MW through WHRB and 9 MW through AFBC) and Fly Ash Bricks of 34,600 TPA by M/s. Neerganga Ispat Pvt. Ltd. located at Village Boriya, Tehsil Berla, District Bemetara, Chhattisgarh. |
|---|---|
| Status | Returned to applicant |
| Status since | 24 Oct 2025 |
| Application filed | 27 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Neerganga Ispat Private Limited |
| Land area | 47.3 acres (19.2 ha) |
| Project cost | ₹265.1 crore |
| Village / locality | Boriya |
| Taluk / tehsil | Berla |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02868 |
All filings for this project
This project has 6 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 27 Aug 2026 | Environmental approval granted | 47.3 acres | ₹265.1 crore |
| Amendment filed 20 Mar 2026 | Environmental approval granted | 47.3 acres | ₹265.1 crore |
| Expansion filed 7 Nov 2025 | Lapsed | 47.3 acres | ₹265.1 crore |
| Amendment filed 27 Sept 2025 (this page) | Returned to applicant | 47.3 acres | ₹265.1 crore |
| New project filed 21 May 2024 | Environmental approval granted | 47.3 acres | ₹265.1 crore |
| New project filed 18 Dec 2023 | Lapsed | 120.4 acres | ₹265.1 crore |
In context
24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 47.3 acres, this one is smaller than 62% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Boriya, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Greenfield Project for installation of manufacturing facilities for… — environmental approval granted, 0 m away
- Proposed Greenfield Project for installation of manufacturing facilities for… — environmental approval granted, 0 m away
- Proposed Greenfield Project for installation of manufacturing facilities for… — lapsed, 0 m away
- Integration of Contiguous Land Area With No Change in Configuration of Plant… — initial checks, 0 m away
- Proposed Greenfield Project for installation of manufacturing facilities for… — environmental approval granted, 100 m away
- Proposed Heavy Structural Steel Fabrication Facility - Zetwerk Manufacturing… — under environmental review, 650 m away
- Kareli Limestone Mine Mr. Abhishek Agrawal (area - 0.87 ha.) — initial checks, 3.9 km away
- Kareli Limestone Mine — more information requested, 3.9 km away
More from Neerganga Ispat Private Limited in Bametara
All 7 Neerganga Ispat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.