| Status | Environmental approval granted |
|---|---|
| Status since | 30 Sept 2024 |
| Application filed | 25 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Athena Chhattisgarh Power Limited |
| Land area | 990.3 acres (400.8 ha) |
| Project cost | ₹8,500 crore |
| Village / locality | Ben\Pali |
| Taluk / tehsil | Dabhra |
| District | Janjgir - Champa |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01457 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 25 Jul 2024 (this page) | Environmental approval granted | 990.3 acres | ₹8,500 crore |
| New project filed 15 Sept 2023 | Environmental approval granted | 990.3 acres | ₹8,500 crore |
| Early planning filed 25 Feb 2023 | Cleared for impact study | 990.3 acres | ₹8,500 crore |
In context
18 applications in Janjgir - Champa since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 990.3 acres, this one is smaller than 89% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ben\Pali, Dabhra, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Existing Environmental Clearance of 2 x 600 MW Coal Based Thermal… — lapsed, 0 m away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — environmental approval granted, 0 m away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — cleared for impact study, 0 m away
- Expansion of existing 2×600 MW Sub-Critical Thermal Power Plant to 3600 MW by… — under environmental review, 0 m away
- Amendment in existing Environmental Clearance of 2 X 600 MW Coal based Thermal… — environmental approval granted, 0 m away
- Expansion of existing 2x600 MW Sub Critical TPP to 4400 MW by addition of… — returned to applicant, 0 m away
- Expansion of existing 2X600 MW subcritical TPP to 6800 MW by addition of 7X800… — returned to applicant, 0 m away
- Expansion by addition of 7 X 800 MW(5600 MW) Coal Based Ultra Super Critical… — withdrawn, 0 m away
More from Athena Chhattisgarh Power Limited in Janjgir - Champa
- "Final/Stage-II Approval" under Section- 2 (i) of the Van (Sanrakshan Evam… — in-principle approval, conditions pending
All 4 Athena Chhattisgarh Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.