| Official title | Amendment in existing Environmental Clearance of 2 X 600 MW Coal based Thermal Power Plant at Village- Singhitarai, Benipali, Odekera and Nimohi, Tehsil- Dabhara, District- Sakti ( Erstwhile Janjgir Champa), Chhattisgarh by M/s Vedanta Limited, Chattisgarh Thermal Power Plant to Vedanta Power Limited, Sakti Thermal Power Plant |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Nov 2026 |
| Application filed | 30 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Vedanta Power Limited |
| Land area | 990.3 acres (400.8 ha) |
| Project cost | ₹8,500 crore |
| Village / locality | Ben\Pali |
| Taluk / tehsil | Dabhra |
| District | Janjgir - Champa |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03662 |
In context
18 applications in Janjgir - Champa since January 2022 are in the same category (Power): 8 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 990.3 acres, this one is smaller than 89% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ben\Pali, Dabhra, Janjgir - Champa, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing 2×600 MW Sub-Critical Thermal Power Plant to 3600 MW by… — under environmental review, 0 m away
- Expansion of existing 2x600 MW Sub Critical TPP to 4400 MW by addition of… — returned to applicant, 0 m away
- Expansion of existing 2X600 MW subcritical TPP to 6800 MW by addition of 7X800… — returned to applicant, 0 m away
- Expansion by addition of 7 X 800 MW(5600 MW) Coal Based Ultra Super Critical… — withdrawn, 0 m away
- Amendment in Existing Environmental Clearance of 2 x 600 MW Coal Based Thermal… — lapsed, 0 m away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — environmental approval granted, 0 m away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — environmental approval granted, 0 m away
- 2x600 MW Coal Based Thermal Power Plant at villages Singhitarai, Benipali,… — cleared for impact study, 0 m away
More from Vedanta Power Limited in Janjgir - Champa
- Expansion of existing 2×600 MW Sub-Critical Thermal Power Plant to 3600 MW by… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.