Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000 TPA),Induction Furnaces with matching LRF&CCM(Hot Billets/Billets/Ingots 2x40 T- 2,64,000 TPA),Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel – 2,31,000 TPA),Galvanizing Plant Pipe unit 2x1 LTPA-2,00,000 TPA, Coal Washery Unit 2x2 MTPA – 40,00,000 TPA,Ferro Alloy Unit 2x9 MVA(FeSi-14,000TPA/FeMn-40,000 TPA/SiMn-28,000 TPA/FeCr

Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000 TPA),Induction Furnaces with matching LRF&CCM(Hot Billets/Billets/Ingots 2x40 T- 2,64,000 TPA),Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel – 2,31,000 TPA),Galvanizing Plant Pipe unit 2x1 LTPA-2,00,000 TPA, Coal Washery Unit 2x2 MTPA – 40,00,000 TPA,Ferro Alloy Unit 2x9 MVA(FeSi-14,000TPA/FeMn-40,000 TPA/SiMn-28,000 TPA/FeCr is a proposed industrial project in Punj\Pathra, Tamnar, Raigarh, Chhattisgarh. The site covers 162.3 acres. Its stated project cost is ₹1,221.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Oct 2024).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000 TPA),Induction Furnaces with matching LRF&CCM(Hot Billets/Billets/Ingots 2x40 T- 2,64,000 TPA),Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel – 2,31,000 TPA),Galvanizing Plant Pipe unit 2x1 LTPA-2,00,000 TPA, Coal Washery Unit 2x2 MTPA – 40,00,000 TPA,Ferro Alloy Unit 2x9 MVA(FeSi-14,000TPA/FeMn-40,000 TPA/SiMn-28,000 TPA/FeCr is a proposed industrial project in Punj\Pathra, Tamnar, Raigarh, Chhattisgarh. The site covers 162.3 acres.

Who is building it?

The applicant is Prismo Steels Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Oct 2024), as of 27 Nov 2026.

Where is it?

In Punj\Pathra, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹1,221.4 crore and a site of 162.3 acres.

When was it filed?

The application was filed on 5 Jun 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000…

Project details

Official titleEstablishment of Greenfield steel plant comprising of DRI Kilns 2x350 TPD&2x200 TPD -3,63,000 TPA),Induction Furnaces with matching LRF&CCM(Hot Billets/Billets/Ingots 2x40 T- 2,64,000 TPA),Rolling Mills(TMT bars/Structural Steel)(85% Hot charging with Hot Billets and remaining 15% through RHF with LDO as fuel – 2,31,000 TPA),Galvanizing Plant Pipe unit 2x1 LTPA-2,00,000 TPA, Coal Washery Unit 2x2 MTPA – 40,00,000 TPA,Ferro Alloy Unit 2x9 MVA(FeSi-14,000TPA/FeMn-40,000 TPA/SiMn-28,000 TPA/FeCr-
StatusCleared for impact study
Status since3 Oct 2024
Application filed5 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPrismo Steels Private Limited
Land area162.3 acres (65.7 ha)
Project cost₹1,221.4 crore
Village / localityPunj\Pathra
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-01472

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Mar 2025Environmental approval granted162.3 acres₹1,221.4 crore
Early planning filed 5 Jun 2024 (this page)Cleared for impact study162.3 acres₹1,221.4 crore

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 162.3 acres, this one is larger than 68% of them.

Where it is

Punj\Pathra, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.