What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Greenfield steel plant by B.S.Sponge Pvt.Ltd. (Badgaon Unit)-Sponge Iron-1320000TPA, Hot Billets/Ingots through IF-1155000 TPA&EAF-330000 TPA, Rolling Mill with RHF (TMT/Wire/Strip/Plate/Structural Steel) -1386000 TPA,MS Pipe Mill-198000 TPA,Coal Washery-2250000 TPA, SEAFs-6x16.5MVA (FeSi-77000 TPA/FeMn-220000 TPA/SiMn-154000 TPA/FeCr-165300 TPA/Pig Iron-264000TPA),WHRB–150MW,FBC–100MW &Oxygen/Nitrogen/Organ Plant-198 Mm3/594 Mm3/19.8 Mm3,Slag Crusher-25 TPH, Fly Ash Brick unit 100000 Bricks/Day

Greenfield steel plant by B.S.Sponge Pvt.Ltd. (Badgaon Unit)-Sponge Iron-1320000TPA, Hot Billets/Ingots through IF-1155000 TPA&EAF-330000 TPA, Rolling Mill with RHF (TMT/Wire/Strip/Plate/Structural Steel) -1386000 TPA,MS Pipe Mill-198000 TPA,Coal Washery-2250000 TPA, SEAFs-6x16.5MVA (FeSi-77000 TPA/FeMn-220000 TPA/SiMn-154000 TPA/FeCr-165300 TPA/Pig Iron-264000TPA),WHRB–150MW,FBC–100MW &Oxygen/Nitrogen/Organ Plant-198 Mm3/594 Mm3/19.8 Mm3,Slag Crusher-25 TPH, Fly Ash Brick unit 100000 Bricks/Day is a proposed industrial project in Bargaon, Tamnar, Raigarh, Chhattisgarh. The site covers 415.4 acres. Its stated project cost is ₹1,775 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jul 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield steel plant by B.S.Sponge Pvt.Ltd. (Badgaon Unit)-Sponge Iron-1320000TPA, Hot Billets/Ingots through IF-1155000 TPA&EAF-330000 TPA, Rolling Mill with RHF (TMT/Wire/Strip/Plate/Structural Steel) -1386000 TPA,MS Pipe Mill-198000 TPA,Coal Washery-2250000 TPA, SEAFs-6x16.5MVA (FeSi-77000 TPA/FeMn-220000 TPA/SiMn-154000 TPA/FeCr-165300 TPA/Pig Iron-264000TPA),WHRB–150MW,FBC–100MW &Oxygen/Nitrogen/Organ Plant-198 Mm3/594 Mm3/19.8 Mm3,Slag Crusher-25 TPH, Fly Ash Brick unit 100000 Bricks/Day is a proposed industrial project in Bargaon, Tamnar, Raigarh, Chhattisgarh. The site covers 415.4 acres.

Who is building it?

The applicant is B.S.Sponge Private LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jul 2025), as of 27 Nov 2026.

Where is it?

In Bargaon, Tamnar, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹1,775 crore and a site of 415.4 acres.

When was it filed?

The application was filed on 5 Jul 2025.

Project details

StatusCleared for impact study
Status since17 Jul 2025
Application filed5 Jul 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantB.S.Sponge Private LTD
Land area415.4 acres (168.1 ha)
Project cost₹1,775 crore
Village / localityBargaon
Taluk / tehsilTamnar
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02613

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 415.4 acres, this one is larger than 88% of them.

Where it is

Bargaon, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from B.S.Sponge Private LTD in Raigarh

All 9 B.S.Sponge projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.