Quick answers
What is this project?
Proposed change in DRI Plant Configuration from 2 x 200 TPD & 2 x 100 TPD Kilns to 2 x 300 TPD Kilns without increase in the Pollution Loads per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change by RISEN INDUSTRIES PVT. LTD is a proposed industrial project in Sarda, Berla, Bametara, Chhattisgarh. The site covers 42.7 acres.
Who is building it?
The applicant is Risen Industries Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Sarda, Berla, Bametara, Chhattisgarh.
How big is it?
It has a stated cost of ₹370 crore and a site of 42.7 acres.
When was it filed?
The application was filed on 16 Jul 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Jul 2024 |
| Application filed | 16 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Risen Industries Private Limited |
| Land area | 42.7 acres (17.3 ha) |
| Project cost | ₹370 crore |
| Village / locality | Sarda |
| Taluk / tehsil | Berla |
| District | Bametara |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-01808 |
In context
24 applications in Bametara since January 2022 are in the same category (Industry): 15 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 42.7 acres, this one is smaller than 71% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarda, Berla, Bametara, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for amendment to the Environmental Clearance (EC) issued to M/s. Risen… — environmental approval granted, 0 m away
- Proposed 400 KLPD Grain Based Distillery — environmental approval granted, 1.6 km away
- Baherghat Sand Mine — lapsed, 2.6 km away
- Request for Amendment to Environmental Clearance (EC) issued to BIOTECH FUELS… — environmental approval granted, 6.4 km away
- Proposed "enhancement in Ethanol (Grain based) Production Capacity from 65… — initial checks, 6.4 km away
- Grain Based Distllery Palnt Capacity of 1 X 65 Klpd — environmental approval granted, 6.4 km away
- Bargaon Brick Eirth Clay Quarry — environmental approval granted, 7 km away
- Dokla Bricks Earth Quarry — environmental approval granted, 7.8 km away
More from Risen Industries Private Limited in Bametara
- Request for amendment to the Environmental Clearance (EC) issued to M/s. Risen… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.