Quick answers
What is this project?
Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha; Maximum Production of Bauxite ROM (1, 27,800 TPA) by M/s MAA Kudargarhi Steels Pvt Ltd is a proposed mining project in Rupakhar, Mainpat, Surguja, Chhattisgarh. The site covers 422.9 acres.
Who is building it?
The applicant is Maa Kudargarhi Steels Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Apr 2025), as of 27 Nov 2026.
Where is it?
In Rupakhar, Mainpat, Surguja, Chhattisgarh.
How big is it?
It has a stated cost of ₹28 crore and a site of 422.9 acres.
When was it filed?
The application was filed on 13 Mar 2024.
Project details
| Official title | Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha; Maximum Production of Bauxite ROM (1, 27,800 TPA) at village- Sapnadar, Tehsil- Mainpat, District- Surguja, State- Chhattisgarh, by M/s MAA Kudargarhi Steels Pvt Ltd |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 Apr 2025 |
| Application filed | 13 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Maa Kudargarhi Steels Private Limited |
| Land area | 422.9 acres (171.1 ha) |
| Project cost | ₹28 crore |
| Village / locality | Rupakhar |
| Taluk / tehsil | Mainpat |
| District | Surguja |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02120 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Dec 2025 | Not approved | 422.9 acres | ₹28 crore |
| New project filed 14 Dec 2025 | Under forest review | 422.9 acres | ₹28 crore |
| Early planning filed 13 Mar 2024 (this page) | Cleared for impact study | 422.9 acres | ₹28 crore |
In context
155 applications in Surguja since January 2022 are in the same category (Mining): 76 approved, 19 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 422.9 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Rupakhar, Mainpat, Surguja, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha;… — not approved, 0 m away
- Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha;… — under forest review, 0 m away
- Kamleshwarpur Bauxite Mining lease — under environmental review, 4.3 km away
- Kamleshwarpur Bauxite Mining lease — cleared for impact study, 4.3 km away
- Pathrai & Lurena Bauxite Mine of M/s Chhattisgarh Mineral Development… — under environmental review, 7.1 km away
- Pathrai & Lurena Bauxite Mine of M/s Chhattisgarh Mineral Development… — cleared for impact study, 7.1 km away
- Narmadapur & Kuniya Bauxite Mine of M/s Chhattisgarh Mineral Development… — under environmental review, 7.4 km away
- Narmadapur & Kuniya Bauxite Mine of M/s Chhattisgarh Mineral Development… — cleared for impact study, 7.5 km away
More from Maa Kudargarhi Steels Private Limited in Surguja
- Composite license of Dandkesra North Extension Bauxite Block Over an area of… — forest land use approved
- Composite License of Dandkesra North Bauxite Block over an Area of 104.80 Ha. — lapsed
- Composite License of Dumarguda Bauxite Block over an Area of 239.00 Ha. — forest land use approved
6 Maa Kudargarhi Steels projects in Surguja
All 18 Maa Kudargarhi Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.