Quick answers
What is this project?
Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha; Maximum Production of Bauxite ROM (1, 27,800 TPA) by M/s MAA Kudargarhi Steels Pvt Ltd is a proposed mining project in Rupakhar, Mainpat, Surguja, Chhattisgarh. The site covers 422.9 acres.
Who is building it?
The applicant is Maa Kudargarhi Steels Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Rupakhar, Mainpat, Surguja, Chhattisgarh.
How big is it?
It has a stated cost of ₹28 crore; a site of 422.9 acres and 275.1 acres (111.3 ha) of forest land.
When was it filed?
The application was filed on 14 Dec 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha; Maximum…
Project details
| Official title | Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha; Maximum Production of Bauxite ROM (1, 27,800 TPA) at village- Sapnadar, Tehsil- Mainpat, District- Surguja, State- Chhattisgarh, by M/s MAA Kudargarhi Steels Pvt Ltd |
|---|---|
| Status | Under forest review |
| Status since | 18 Nov 2026 |
| Application filed | 14 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Maa Kudargarhi Steels Private Limited |
| Land area | 422.9 acres (171.1 ha) |
| Forest land | 275.1 acres (111.3 ha) |
| Project cost | ₹28 crore |
| Village / locality | Rupakhar |
| Taluk / tehsil | Mainpat |
| District | Surguja |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04196 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Dec 2025 | Not approved | 422.9 acres | ₹28 crore |
| New project filed 14 Dec 2025 (this page) | Under forest review | 422.9 acres | ₹28 crore |
| Early planning filed 13 Mar 2024 | Cleared for impact study | 422.9 acres | ₹28 crore |
In context
155 applications in Surguja since January 2022 are in the same category (Mining): 76 approved, 19 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 422.9 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Rupakhar, Mainpat, Surguja, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha;… — not approved, 0 m away
- Proposed Sapnadar (Block A, B, C) Bauxite Block Over an Area of 171.136 Ha;… — cleared for impact study, 0 m away
- Kamleshwarpur Bauxite Mining lease — under environmental review, 4.3 km away
- Kamleshwarpur Bauxite Mining lease — cleared for impact study, 4.3 km away
- Pathrai & Lurena Bauxite Mine of M/s Chhattisgarh Mineral Development… — under environmental review, 7.1 km away
- Pathrai & Lurena Bauxite Mine of M/s Chhattisgarh Mineral Development… — cleared for impact study, 7.1 km away
- Narmadapur & Kuniya Bauxite Mine of M/s Chhattisgarh Mineral Development… — under environmental review, 7.4 km away
- Narmadapur & Kuniya Bauxite Mine of M/s Chhattisgarh Mineral Development… — cleared for impact study, 7.5 km away
More from Maa Kudargarhi Steels Private Limited in Surguja
- Composite license of Dandkesra North Extension Bauxite Block Over an area of… — forest land use approved
- Composite License of Dandkesra North Bauxite Block over an Area of 104.80 Ha. — lapsed
- Composite License of Dumarguda Bauxite Block over an Area of 239.00 Ha. — forest land use approved
6 Maa Kudargarhi Steels projects in Surguja
All 18 Maa Kudargarhi Steels projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.