Project details
| Official title | Establishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd at Village: Ameriakbari, Tehsil: Bilha, District: Bilaspur, State: Chhattisgarh. |
|---|---|
| Status | Cleared for impact study |
| Status since | 20 Sept 2024 |
| Application filed | 30 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hd India Iron and Coal Power Private Limited |
| Land area | 91.5 acres (37 ha) |
| Project cost | ₹300 crore |
| Village / locality | Ameri Akbari |
| Taluk / tehsil | Bilha |
| District | Bilaspur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02199 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Mar 2026 | Under environmental review | 91.5 acres | ₹300 crore |
| Early planning filed 30 Jul 2024 (this page) | Cleared for impact study | 91.5 acres | ₹300 crore |
In context
47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 91.5 acres, this one is larger than 57% of them.
Where it is
Ameri Akbari, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850… — under environmental review, 0 m away
- Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850… — withdrawn, 13.8 km away
- Application for amendment in Environmental Clearance for reduction in project… — environmental approval granted, 35.3 km away
- Request for amendment to the Environmental Clearance (EC) of Bilaspur Mining… — environmental approval granted, 35.3 km away
- Transfer of Environment Clearance Due to Change in Ownership — environmental approval granted, 35.3 km away
- Steel Pipe and Flat Product Manufacturing including ERW/ Pickling / CRCA/… — lapsed, 35.6 km away
- Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron -… — environmental approval granted, 35.6 km away
- Greenfield steel plant comprising of DRI Kilns – 2 x 250 TPD (Sponge Iron -… — cleared for impact study, 35.6 km away