Cleared for impact studyIndustry · Bilaspur, Chhattisgarh

Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd

Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd is a proposed industrial project in Ameri Akbari, Bilha, Bilaspur, Chhattisgarh. The site covers 91.5 acres. Its stated project cost is ₹300 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Sept 2024).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleEstablishment of Greenfield steel plant for production of 1,81,500 TPA Sponge Iron, 2,32,850 TPA MS Billets, 2,25,860 TPA Rerolled Steel products, 34,000 TPA (max) Ferro Alloys, Captive Power Plant for 24 MW (WHRB-12 MW and AFBC-12 MW) power generation, Installation of 1,200,000 TPA Coal Washery and 37,500 TPA Fly Ash Bricks/Blocks Plant by M/s HD India Iron and Coal Power Pvt. Ltd at Village: Ameriakbari, Tehsil: Bilha, District: Bilaspur, State: Chhattisgarh.
StatusCleared for impact study
Status since20 Sept 2024
Application filed30 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantHd India Iron and Coal Power Private Limited
Land area91.5 acres (37 ha)
Project cost₹300 crore
Village / localityAmeri Akbari
Taluk / tehsilBilha
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02199

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 26 Mar 2026Under environmental review91.5 acres₹300 crore
Early planning filed 30 Jul 2024 (this page)Cleared for impact study91.5 acres₹300 crore

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 91.5 acres, this one is larger than 57% of them.

Where it is

Ameri Akbari, Bilha, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.