Project details
| Official title | Proposed Construction of 756 Nos. of Flats for Balco for Growth Project by Bharat Aluminium Company Limited (Balco) |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Sept 2025 |
| Application filed | 19 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bharat Aluminium Company LTD |
| Use | Residential |
| Units | 756 |
| Towers | 7 |
| Floors (tallest) | 10 |
| Parking spaces | 769 |
| Land area | 15.5 acres (6.3 ha) |
| Built-up area | 99,843 m² (10,74,700 sq ft) |
| Plot area | 62,640 m² (6,74,251 sq ft) |
| Project cost | ₹350.3 crore |
| Village / locality | Patibahar |
| Taluk / tehsil | Korba |
| District | Korba |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02450 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patibahar, Korba, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 220 KV Dcds Line Between 765/400/220 KV Dharamjaigarh (Pgcil) Substation &… — under forest review, 1.9 km away
- Amendment in Environment Clearance for FGD exemption as per MoEFCC… — lapsed, 2.1 km away
- Swami Vivekanand Education & Training Center Korba — lapsed, 4.1 km away
- 2x250MW,Thermal Power Plant at Korba (East), Chhattisgarh of M/s Chhattisgarh… — returned to applicant, 5.3 km away
- 2x250 MW , Thermal Power Plant at Korba (East), Chhattisgarh of M/s… — returned to applicant, 5.3 km away
- 2x250 MW , Thermal Power Plant, Chhattisgarh State Electricity Board (CSEB)… — withdrawn, 5.3 km away
- Amendment of 2x250 MW coal based Thermal Power Plant as per MOEF&CC… — lapsed, 5.3 km away
- Dr. Shyama Prasad Mukharji Thermal Power Station, M/s Chhattisgarh State Power… — lapsed, 5.4 km away
More from Bharat Aluminium Company LTD in Korba
- Amendment in Environment Clearance for FGD exemption as per MoEFCC… — lapsed
- Validation of Existing EC as per notification S.O. 1530 (E) dated 06.04.2018… — returned to applicant
- Amendment in Environmental Clearance of Chotia II captive Coal Mine (ML Area:… — environmental approval granted
- Validation of Existing Ec As Per Notification S.O. 1530 (E) Dated 06.04.2018… — returned to applicant
5 Bharat Aluminium Company projects in Korba
All 6 Bharat Aluminium Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.