2x250 MW , Thermal Power Plant, Chhattisgarh State Electricity Board (CSEB) Korba East

2x250 MW , Thermal Power Plant, Chhattisgarh State Electricity Board (CSEB) Korba East is a withdrawn power project in Korba, Chhattisgarh. The site covers 155 acres. Its stated project cost is ₹446.3 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 27 Aug 2026).

See it on the live map All projects in Korba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since27 Aug 2026
Application filed27 Aug 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantChhattisgarh State Power Generation Company Limited
Land area155 acres (62.7 ha)
Project cost₹446.3 crore
Village / localityKorba
Taluk / tehsilKorba
DistrictKorba
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03247

In context

27 applications in Korba since January 2022 are in the same category (Power): 10 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 155 acres, this one is smaller than 85% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Korba, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chhattisgarh State Power Generation Company Limited in Korba

16 Chhattisgarh State Power projects in Korba
All 30 Chhattisgarh State Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.