Quick answers
What is 15 MT x 2 Nos of induction furnace?
15 MT x 2 Nos of induction furnace is an approved industrial project in Samaruma, Tamnar, Raigarh, Chhattisgarh. The site covers 7.8 acres.
Who is building it?
The applicant is Mk Tmt and Steels Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Jun 2026), as of 27 Nov 2026.
Where is it?
In Samaruma, Tamnar, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹85 crore and a site of 7.8 acres.
When was it filed?
The application was filed on 18 Sept 2025.
Project details
| Official title | Installation Of 15 MT x 2 Nos of induction furnace along with CCMs to produce 105,600 TPA MS Ingot/ Billet along with Rolling Mill with Direct Hot Charging facility to produce 101,418 TPA Rerolled Steel Products; mainly in the form of TMT. |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Jun 2026 |
| Application filed | 18 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Mk Tmt and Steels Private Limited |
| Land area | 7.8 acres (3.1 ha) |
| Project cost | ₹85 crore |
| Village / locality | Samaruma |
| Taluk / tehsil | Tamnar |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02637 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.8 acres, this one is smaller than 90% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Samaruma, Tamnar, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of the Existing Integrated Steel Plant — environmental approval granted, 1.7 km away
- Expansion of the Existing Integrated Steel Plant — cleared for impact study, 1.7 km away
- Transfer of Environment Clearance from M/s. SHRI NIRMALANAND STEELS CASTING… — lapsed, 2.4 km away
- Enhancement of MS Ingot/Billet production from 58,360TPA to 168,000TPA,… — environmental approval granted, 2.6 km away
- Diversion of Forest land for non-forest purpose under Forest Conservation Act,… — lapsed, 3.7 km away
- Diversion of Forest land for non-forest purpose under Forest Conservation Act,… — lapsed, 3.8 km away
- Laying of 33KVA Dedicated Line Banjari to Punjipathra — lapsed, 4.6 km away