Proposed "Increase in production capacity of existing DRI plant (1 x 650 TPD Kiln) Production from 2,14,500 TPA to 2,83,305 TPA Capacity without increase in the Pollution Load in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Chiraipani, Raigarh, Chhattisgarh. The site covers 53.3 acres.
Who is building it?
The applicant is Sunil Ispat and Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Chiraipani, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹603.2 crore and a site of 53.3 acres.
When was it filed?
The application was filed on 20 Sept 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 20 Sept 2025 |
| Application filed | 20 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sunil Ispat and Power Limited |
| Land area | 53.3 acres (21.6 ha) |
| Project cost | ₹603.2 crore |
| Village / locality | Chiraipani |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-02676 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 53.3 acres, this one is smaller than 58% of them.
41 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiraipani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Steel Plant –Induction Furnaces with CCM & LRF (Hot Billets / MS… — lapsed, 150 m away
- Amendment in TOR issued to M/s. Mahalaxmi Casting Pvt. Ltd. for Regularization… — not approved, 150 m away
- Environmental Clearance for proposed regularization cum expansion of the… — more information requested, 150 m away
- Proposed regularization of the existing Rolling Mill - 30,000 TPA Capacity as… — cleared for impact study, 150 m away
- Capacity Expansion of Manufacturing Facilities to Produce Mild Steel Billet… — under environmental review, 500 m away
- Request for issue of Amendments to the Environmental Clearance (EC) issued to… — more information requested, 800 m away
- Transfer of Environment Clearance from M/s. Salasar Steel and Power Ltd. to… — under environmental review, 800 m away
- Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with… — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.