Environmental approval grantedIndustry · Raigarh, Chhattisgarh

Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with CCM&LRF(Hot billets/Billets/MSIngots)-0.097mTPA to 0.427m TPA),WHRB based Power from 4.5 MWto34.5 MW, Brick Manufacturing unit (60000 Bricks/day to 127000 Bricks/day), New units :0.8mTPA of I/O Pellet Plant with Gasifier 30000 NM3/Hr,Rolling Mill(TMT bars/Structural Steel)0.4125mTPA with Gasifier 3700 NM3/Hr,4 x 15 MVA Ferro Alloys (FeSi-0.0466m TPA/FeMn-0.168mTPA/SiMn-0.096 TPA/FeCr-0.1mTPA),Briquettingunit-670 Kg/Hr

Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with CCM&LRF(Hot billets/Billets/MSIngots)-0.097mTPA to 0.427m TPA),WHRB based Power from 4.5 MWto34.5 MW, Brick Manufacturing unit (60000 Bricks/day to 127000 Bricks/day), New units :0.8mTPA of I/O Pellet Plant with Gasifier 30000 NM3/Hr,Rolling Mill(TMT bars/Structural Steel)0.4125mTPA with Gasifier 3700 NM3/Hr,4 x 15 MVA Ferro Alloys (FeSi-0.0466m TPA/FeMn-0.168mTPA/SiMn-0.096 TPA/FeCr-0.1mTPA),Briquettingunit-670 Kg/Hr is an approved industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 68.8 acres. Its stated project cost is ₹686 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Apr 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with CCM&LRF(Hot billets/Billets/MSIngots)-0.097mTPA to 0.427m TPA),WHRB based Power from 4.5 MWto34.5 MW, Brick Manufacturing unit (60000 Bricks/day to 127000 Bricks/day), New units :0.8mTPA of I/O Pellet Plant with Gasifier 30000 NM3/Hr,Rolling Mill(TMT bars/Structural Steel)0.4125mTPA with Gasifier 3700 NM3/Hr,4 x 15 MVA Ferro Alloys (FeSi-0.0466m TPA/FeMn-0.168mTPA/SiMn-0.096 TPA/FeCr-0.1mTPA),Briquettingunit-670 Kg/Hr is an approved industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 68.8 acres.

Who is building it?

The applicant is Salasar Steel and Power Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Apr 2026), as of 27 Nov 2026.

Where is it?

In Gerwani, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹686 crore and a site of 68.8 acres.

When was it filed?

The application was filed on 11 Oct 2024.

Project details

StatusEnvironmental approval granted
Status since21 Apr 2026
Application filed11 Oct 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantSalasar Steel and Power Limited
Land area68.8 acres (27.9 ha)
Project cost₹686 crore
Village / localityGerwani
Taluk / tehsilRaigarh
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00802

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 68.8 acres, this one is smaller than 55% of them.

44 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gerwani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Salasar Steel and Power Limited in Raigarh

All 3 Salasar Steel and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.