Expansion of Steel Plant:DRI Kilns(Sponge Iron-0.06mTPA to 0.456mTPA), IF with CCM&LRF(Hot billets/Billets/MSIngots)-0.097mTPA to 0.427m TPA),WHRB based Power from 4.5 MWto34.5 MW, Brick Manufacturing unit (60000 Bricks/day to 127000 Bricks/day), New units :0.8mTPA of I/O Pellet Plant with Gasifier 30000 NM3/Hr,Rolling Mill(TMT bars/Structural Steel)0.4125mTPA with Gasifier 3700 NM3/Hr,4 x 15 MVA Ferro Alloys (FeSi-0.0466m TPA/FeMn-0.168mTPA/SiMn-0.096 TPA/FeCr-0.1mTPA),Briquettingunit-670 Kg/Hr is an approved industrial project in Gerwani, Raigarh, Chhattisgarh. The site covers 68.8 acres.
Who is building it?
The applicant is Salasar Steel and Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gerwani, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹686 crore and a site of 68.8 acres.
When was it filed?
The application was filed on 11 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Apr 2026 |
| Application filed | 11 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Salasar Steel and Power Limited |
| Land area | 68.8 acres (27.9 ha) |
| Project cost | ₹686 crore |
| Village / locality | Gerwani |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00802 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 68.8 acres, this one is smaller than 55% of them.
44 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gerwani, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request for issue of Amendments to the Environmental Clearance (EC) issued to… — more information requested, 0 m away
- Transfer of Environment Clearance from M/s. Salasar Steel and Power Ltd. to… — under environmental review, 0 m away
- Diversion of Revenue Forest Land in Villages Chiraipani and Gerwani, Range… — not approved, 100 m away
- Proposed Change in Induction Furnaces Configuration From 3 X 15 T As Per Ec to… — initial checks, 400 m away
- Transfer of TOR letter from Shambhavi Ispat to Shambhavi Ispat Pvt. Ltd. for… — cleared for impact study, 550 m away
- Expansion of Steel Plant by Backward Integration of steel plant comprising of… — cleared for impact study, 550 m away
- Expansion of Steel Plant by Backward Integration of steel plant comprising of… — returned to applicant, 550 m away
- Transfer of Environment Clearance (EC) of M/s. Shambhavi Ispat to M/s/.… — environmental approval granted, 550 m away
More from Salasar Steel and Power Limited in Raigarh
- Request for issue of Amendments to the Environmental Clearance (EC) issued to… — more information requested
- Transfer of Environment Clearance from M/s. Salasar Steel and Power Ltd. to… — under environmental review
All 3 Salasar Steel and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.