What is Developing? Open the mapMap

Environmental approval grantedIndustry · Baloda Bazar, Chhattisgarh

Greenfield steel project of DRI based Sponge Iron 700000 TPA I/O Pellets 1200000 TPA PGP 25000 Nm3/hr MS Billets with IF & EAF 1045000 TPA Rerolled Steel Products of 1000000 TPA Cold Rolled Products 600000 TPA Steel Tube/Pipes and other profiles 1000000 TPA Strip/Coil Pickling & Annealing 1000000 TPA Galvanized Steel 300000 TPA Ferro Alloy plant of 48,000 TPA with SAF 2x9 MVA and/or Pig Iron#76,000 TPA Coal Washery 0.8 MTPA Oxygen Plant 45000 Nm3/hr CPP of 85 MW & Brick Plant 100000 Bricks/day.

Greenfield steel project of DRI based Sponge Iron 700000 TPA I/O Pellets 1200000 TPA PGP 25000 Nm3/hr MS Billets with IF & EAF 1045000 TPA Rerolled Steel Products of 1000000 TPA Cold Rolled Products 600000 TPA Steel Tube/Pipes and other profiles 1000000 TPA Strip/Coil Pickling & Annealing 1000000 TPA Galvanized Steel 300000 TPA Ferro Alloy plant of 48,000 TPA with SAF 2x9 MVA and/or Pig Iron#76,000 TPA Coal Washery 0.8 MTPA Oxygen Plant 45000 Nm3/hr CPP of 85 MW & Brick Plant 100000 Bricks/day is an approved industrial project in Kesda, Simga, Baloda Bazar, Chhattisgarh. The site covers 101.9 acres. Its stated project cost is ₹1,220.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 24 Nov 2025).

See it on the live map All projects in Baloda Bazar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since24 Nov 2025
Application filed24 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantSambhv Tubes Private Limited
Land area101.9 acres (41.3 ha)
Project cost₹1,220.1 crore
Village / localityKesda
Taluk / tehsilSimga
DistrictBaloda Bazar
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02807

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Sept 2025 (this page)Environmental approval granted101.9 acres₹1,220.1 crore
Early planning filed 26 Nov 2024Cleared for impact study101.9 acres₹1,220.1 crore

In context

31 applications in Baloda Bazar since January 2022 are in the same category (Industry): 21 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 101.9 acres, this one is smaller than 71% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kesda, Simga, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.