What is Developing? Open the mapMap

Initial checksIndustry · Raipur, Chhattisgarh

For proposed "Change in Furnaces configuration from (8 x 15 MT, 2 x 15 MT – Total IF Capacity 150 MT) to (6 x 22 MT , 1 x 18 MT – Total IF capacity 150 MT) under NO INCREASE IN POLLUTION LOAD (NIPL) in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change

For proposed "Change in Furnaces configuration from (8 x 15 MT, 2 x 15 MT – Total IF Capacity 150 MT) to (6 x 22 MT , 1 x 18 MT – Total IF capacity 150 MT) under NO INCREASE IN POLLUTION LOAD (NIPL) in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Sarora, Tilda, Raipur, Chhattisgarh. The site covers 50.6 acres. Its stated project cost is ₹325 crore. As of 27 Nov 2026, its status is “Initial checks” (since 7 May 2025).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

For proposed "Change in Furnaces configuration from (8 x 15 MT, 2 x 15 MT – Total IF Capacity 150 MT) to (6 x 22 MT , 1 x 18 MT – Total IF capacity 150 MT) under NO INCREASE IN POLLUTION LOAD (NIPL) in the existing plant premises as per Gazette Notification dated 23rd November 2016 & 16th January, 2020 & 2nd March 2021 issued by Ministry of Environment, Forest & Climate Change is a proposed industrial project in Sarora, Tilda, Raipur, Chhattisgarh. The site covers 50.6 acres.

Who is building it?

The applicant is Mahendra Sponge & Power Private Limited (Unit-Ii).

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Sarora, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹325 crore and a site of 50.6 acres.

When was it filed?

The application was filed on 7 May 2025.

Project details

StatusInitial checks
Status since7 May 2025
Application filed7 May 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantMahendra Sponge & Power Private Limited (Unit-Ii)
Land area50.6 acres (20.5 ha)
Project cost₹325 crore
Village / localitySarora
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-02987

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 50.6 acres, this one is larger than 71% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sarora, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Mahendra Sponge and Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.