Environmental approval grantedIndustry · Raipur, Chhattisgarh

Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces by M/s. Hi-Tech Power and Steel Limited

Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces by M/s. Hi-Tech Power and Steel Limited is an approved industrial project in Parsada, Tilda, Raipur, Chhattisgarh. The site covers 75.3 acres. Its stated project cost is ₹421.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 6 May 2023).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces by M/s. Hi-Tech Power and Steel Limited is an approved industrial project in Parsada, Tilda, Raipur, Chhattisgarh. The site covers 75.3 acres.

Who is building it?

The applicant is Hi Tech Power and Steel Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 6 May 2023), as of 27 Nov 2026.

Where is it?

In Parsada, Tilda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹421.6 crore and a site of 75.3 acres.

When was it filed?

The application was filed on 6 May 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills…

Project details

Official titleExpansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces at Village: Parsada, Post: Sarora, Tehsil: Tilda, District: Raipur, Chhattisgarh by M/s. Hi-Tech Power and Steel Limited
StatusEnvironmental approval granted
Status since6 May 2023
Application filed6 May 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantHi Tech Power and Steel Limited
Land area75.3 acres (30.5 ha)
Project cost₹421.6 crore
Village / localityParsada
Taluk / tehsilTilda
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-00054

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 18 Aug 2026Environmental approval granted75.3 acres₹421.6 crore
Expansion filed 6 May 2023 (this page)Environmental approval granted75.3 acres₹421.6 crore

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.3 acres, this one is larger than 79% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Parsada, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hi Tech Power and Steel Limited in Raipur

All 3 Hi Tech Power and Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.