What is this project?
Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces by M/s. Hi-Tech Power and Steel Limited is an approved industrial project in Parsada, Tilda, Raipur, Chhattisgarh. The site covers 75.3 acres.
Who is building it?
The applicant is Hi Tech Power and Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2023), as of 27 Nov 2026.
Where is it?
In Parsada, Tilda, Raipur, Chhattisgarh.
How big is it?
It has a stated cost of ₹421.6 crore and a site of 75.3 acres.
When was it filed?
The application was filed on 6 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills…
Project details
| Official title | Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces, Rolling Mills (Hot Charging and Reheating), Captive Power Plant (AFBC+WHRB), Fly Ash Bricks Unit and New Sub-Merged Arc Furnaces at Village: Parsada, Post: Sarora, Tehsil: Tilda, District: Raipur, Chhattisgarh by M/s. Hi-Tech Power and Steel Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 May 2023 |
| Application filed | 6 May 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Hi Tech Power and Steel Limited |
| Land area | 75.3 acres (30.5 ha) |
| Project cost | ₹421.6 crore |
| Village / locality | Parsada |
| Taluk / tehsil | Tilda |
| District | Raipur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-00054 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Aug 2026 | Environmental approval granted | 75.3 acres | ₹421.6 crore |
| Expansion filed 6 May 2023 (this page) | Environmental approval granted | 75.3 acres | ₹421.6 crore |
In context
219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.3 acres, this one is larger than 79% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parsada, Tilda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Production Capacity of Sponge Iron Kilns, Induction Furnaces,… — environmental approval granted, 0 m away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 0 m away
- No Increase in Pollution Load and No Increase in Production Capacity of the… — initial checks, 850 m away
- For proposed "Change in Furnaces configuration from (8 x 15 MT, 2 x 15 MT –… — initial checks, 1.2 km away
- Greenfield Project of 60 KLPD Grain Based Ethanol Plant by Shri. Sanjay Gupta… — environmental approval granted, 1.5 km away
- Industrial project by M/S Central Cement Industries — initial checks, 1.9 km away
- Industrial project by M/S Central Cement Industries — environmental approval granted, 1.9 km away
- Industrial project by M/S Central Cement Industries — cleared for impact study, 1.9 km away
More from Hi Tech Power and Steel Limited in Raipur
All 3 Hi Tech Power and Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.