Quick answers
What is this project?
Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr is a proposed industrial project in Tumidih, Gharghoda, Raigarh, Chhattisgarh. The site covers 16.4 acres.
Who is building it?
The applicant is Simn Ferro Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Aug 2026), as of 27 Nov 2026.
Where is it?
In Tumidih, Gharghoda, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹52 crore and a site of 16.4 acres.
When was it filed?
The application was filed on 25 Apr 2026.
Project details
| Official title | Establishment of Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr. |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Aug 2026 |
| Application filed | 25 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Simn Ferro Private Limited |
| Land area | 16.4 acres (6.6 ha) |
| Project cost | ₹52 crore |
| Village / locality | Tumidih |
| Taluk / tehsil | Gharghoda |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03140 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.4 acres, this one is smaller than 76% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tumidih, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (12.4 km away).
Other projects nearby
- Railway Siding — more information requested, 1.9 km away
- Railway Siding — lapsed, 1.9 km away
- Coal Washery and Railway Siding — lapsed, 2 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000TPA to 2,40,000… — environmental approval granted, 2.7 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 60,000TPA to 2,40,000… — cleared for impact study, 2.7 km away
- Kanchanpur Ordinary Sand Quarry, Area- 2.00 Ha.,Village – Kanchanpur, Project… — under environmental review, 3.4 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — under environmental review, 3.9 km away
- Greenfield Steel Project-Nawapara Unit-I/O Pellets(1.2MTPA)+PGP(30000NM3/Hr),Sp… — cleared for impact study, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.