What is Developing? Open the mapMap

Cleared for impact studyIndustry · Raigarh, Chhattisgarh

Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr

Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr is a proposed industrial project in Tumidih, Gharghoda, Raigarh, Chhattisgarh. The site covers 16.4 acres. Its stated project cost is ₹52 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Aug 2026).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr is a proposed industrial project in Tumidih, Gharghoda, Raigarh, Chhattisgarh. The site covers 16.4 acres.

Who is building it?

The applicant is Simn Ferro Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Aug 2026), as of 27 Nov 2026.

Where is it?

In Tumidih, Gharghoda, Raigarh, Chhattisgarh.

How big is it?

It has a stated cost of ₹52 crore and a site of 16.4 acres.

When was it filed?

The application was filed on 25 Apr 2026.

Project details

Official titleEstablishment of Submerged Electric Arc Furnaces -2x 9 MVA (Fesi-14,000TPA / FeMn-40,000 TPA / SiMn-28,000TPA / FeCr-30,000 TPA / PigIron-48,000TPA.) &Briquetting Plant - 200Kg/Hr.
StatusCleared for impact study
Status since6 Aug 2026
Application filed25 Apr 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSimn Ferro Private Limited
Land area16.4 acres (6.6 ha)
Project cost₹52 crore
Village / localityTumidih
Taluk / tehsilGharghoda
DistrictRaigarh
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03140

In context

113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 16.4 acres, this one is smaller than 76% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tumidih, Gharghoda, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to South Eastern Coalfields Plans a 15-Million-Tonne-a-Year Coal Mine Expansion in Raigarh, Chhattisgarh (12.4 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.