Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 7 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | UltraTech Cement Limited |
| Land area | 548.6 acres (222 ha) |
| Village / locality | Semaradih |
| Taluk / tehsil | Baloda Bazar |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03205 |
In context
31 applications in Baloda Bazar since January 2022 are in the same category (Industry): 21 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 548.6 acres, this one is larger than 71% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Semaradih, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mudhipar Limestone Quarry (Janak Ram Verma) — environmental approval granted, 2.9 km away
- Mudhipar Limestone Quarry — lapsed, 2.9 km away
- Dindayal Agrawal limestone Quarry Mudipar — lapsed, 3 km away
- Smt Uma Bai Verma Limestone Quarry Mudipar — lapsed, 3.1 km away
- Mudhipar Limestone Mine Project — under environmental review, 3.1 km away
- Smt Geeta Bai verma Limestone Quarry Mudipar — lapsed, 3.2 km away
- Vijaylaxmi Verma Limestone Quarry Mudipar — lapsed, 3.3 km away
- Mudhipar Limestone Quarry (Vijay Laxmi Verma) — lapsed, 3.3 km away
More from UltraTech Cement Limited in Baloda Bazar
- Proposed Hirmi - II South Limestone Block (Auctioned Block) (Area: 207.673 ha)… — under environmental review
- Proposed Hirmi - II North Limestone Block (Auctioned Block) (Area: 204.326 ha)… — under environmental review
- Amendment in Existing Environmental Clearance letter granted vide F. No.… — under environmental review
- Proposed Hirmi - II South Limestone Block (Auctioned Block) (Area: 207.673 ha)… — cleared for impact study
- Proposed Hirmi - II North Limestone Block (Auctioned Block) (Area: 204.326 ha)… — cleared for impact study
- Amendment in extension in validity letter dated 24th Jan., 2022 of existing EC… — lapsed
9 UltraTech Cement projects in Baloda Bazar
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.