Greenfield Steel plant of 2x350TPD DRI Kilns to produce 231000TPA Sponge Iron, SMS with 5x15T IF, 20T LRF & CCM to produce 247500 TPA Hot Billets/MS Billets, Rolling Mill to Produce 231000TPA Rolled products (Wire Rod, TMT bar, Structure Steel etc.), Ferro Alloy plant (2x9 MVA SAF) to produce 23760TPA of Si-Mn 14850TPA Fe-Si or 36960TPA Fe-Mn 36300TPA Pig Iron, 45MW Captive Power Plant (WHRB#20 MW+AFBC#25 MW) & Fly Ash Brick Plant (385 TPD) by M/s Metnext Private Limited

Greenfield Steel plant of 2x350TPD DRI Kilns to produce 231000TPA Sponge Iron, SMS with 5x15T IF, 20T LRF & CCM to produce 247500 TPA Hot Billets/MS Billets, Rolling Mill to Produce 231000TPA Rolled products (Wire Rod, TMT bar, Structure Steel etc.), Ferro Alloy plant (2x9 MVA SAF) to produce 23760TPA of Si-Mn 14850TPA Fe-Si or 36960TPA Fe-Mn 36300TPA Pig Iron, 45MW Captive Power Plant (WHRB#20 MW+AFBC#25 MW) & Fly Ash Brick Plant (385 TPD) by M/s Metnext Private Limited is a proposed industrial project in Ghutku, Takhatpur, Bilaspur, Chhattisgarh. The site covers 147.4 acres. Its stated project cost is ₹600 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 7 Aug 2026).

See it on the live map All projects in Bilaspur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since7 Aug 2026
Application filed31 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantMetnext Private Limited
Land area147.4 acres (59.7 ha)
Project cost₹600 crore
Village / localityGhutku
Taluk / tehsilTakhatpur
DistrictBilaspur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03395

In context

47 applications in Bilaspur since January 2022 are in the same category (Industry): 26 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 147.4 acres, this one is larger than 81% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ghutku, Takhatpur, Bilaspur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.