Under environmental reviewIndustry · Raipur, Chhattisgarh

Expansion of Steel Plant–Sponge Iron-60000 to 290000 TPA),MS Ingots/ Billets/blooms- 88320 to 396000 TPA, Re-Rolling Mill (TMT Bars/Structural Steel Strips/Wire rod- 150000 to 350000 TPA, Coal Gasifier-2x6000 Nm3/hr, New SEAFs-2x6 MVA (Ferro Alloys), WHRB Power Plant- 4 to 29 MW, Conversion of existing FBC Power Plant to Biomass Power plant-6.0 & Addl. 15 MW Biomass Power plant, Brick unit from 20000 to 80000 Bricks/Day, Slag crushing unit from 10000 to 35000 TPA, New Briquetting Plant-100 kg/hr

Expansion of Steel Plant–Sponge Iron-60000 to 290000 TPA),MS Ingots/ Billets/blooms- 88320 to 396000 TPA, Re-Rolling Mill (TMT Bars/Structural Steel Strips/Wire rod- 150000 to 350000 TPA, Coal Gasifier-2x6000 Nm3/hr, New SEAFs-2x6 MVA (Ferro Alloys), WHRB Power Plant- 4 to 29 MW, Conversion of existing FBC Power Plant to Biomass Power plant-6.0 & Addl. 15 MW Biomass Power plant, Brick unit from 20000 to 80000 Bricks/Day, Slag crushing unit from 10000 to 35000 TPA, New Briquetting Plant-100 kg/hr is a proposed industrial project in Jarauda, Raipur, Chhattisgarh. The site covers 64.5 acres. Its stated project cost is ₹664.7 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 17 Aug 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Steel Plant–Sponge Iron-60000 to 290000 TPA),MS Ingots/ Billets/blooms- 88320 to 396000 TPA, Re-Rolling Mill (TMT Bars/Structural Steel Strips/Wire rod- 150000 to 350000 TPA, Coal Gasifier-2x6000 Nm3/hr, New SEAFs-2x6 MVA (Ferro Alloys), WHRB Power Plant- 4 to 29 MW, Conversion of existing FBC Power Plant to Biomass Power plant-6.0 & Addl. 15 MW Biomass Power plant, Brick unit from 20000 to 80000 Bricks/Day, Slag crushing unit from 10000 to 35000 TPA, New Briquetting Plant-100 kg/hr is a proposed industrial project in Jarauda, Raipur, Chhattisgarh. The site covers 64.5 acres.

Who is building it?

The applicant is Nutan Ispat And Power Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Jarauda, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹664.7 crore and a site of 64.5 acres.

When was it filed?

The application was filed on 6 Mar 2026.

Project details

StatusUnder environmental review
Status since17 Aug 2026
Application filed6 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNutan Ispat And Power Private Limited
Land area64.5 acres (26.1 ha)
Project cost₹664.7 crore
Village / localityJarauda
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03457

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 64.5 acres, this one is larger than 77% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jarauda, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.