LapsedIndustry · Raipur, Chhattisgarh

Expansion of Grain Based Distillery Plant from 100 KLD to 300 KLD (300 KLD Bio-Ethanol or 200 KLD Bio-Ethanol + 100 KLD ENA or 100 TPD derivatives i.e Ethyl/ Methyl/ Butyl Acetates, Bio Acetic Acid/ Crotanaldehyde/ Bio Butanol) with Co-generation Power Plant from 3 MW to 12 MW by M/s Aarti Synergy Private Limited

Expansion of Grain Based Distillery Plant from 100 KLD to 300 KLD (300 KLD Bio-Ethanol or 200 KLD Bio-Ethanol + 100 KLD ENA or 100 TPD derivatives i.e Ethyl/ Methyl/ Butyl Acetates, Bio Acetic Acid/ Crotanaldehyde/ Bio Butanol) with Co-generation Power Plant from 3 MW to 12 MW by M/s Aarti Synergy Private Limited is a lapsed industrial project in Dande Kalan, Raipur, Chhattisgarh. The site covers 30.3 acres. Its stated project cost is ₹3.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 Aug 2026).

See it on the live map All projects in Raipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Grain Based Distillery Plant from 100 KLD to 300 KLD (300 KLD Bio-Ethanol or 200 KLD Bio-Ethanol + 100 KLD ENA or 100 TPD derivatives i.e Ethyl/ Methyl/ Butyl Acetates, Bio Acetic Acid/ Crotanaldehyde/ Bio Butanol) with Co-generation Power Plant from 3 MW to 12 MW by M/s Aarti Synergy Private Limited is a lapsed industrial project in Dande Kalan, Raipur, Chhattisgarh. The site covers 30.3 acres.

Who is building it?

The applicant is Aarti Synergy Private Limited.

Has it been approved?

No. The application was lapsed on 1 Aug 2026, so it is no longer under consideration.

Where is it?

In Dande Kalan, Raipur, Chhattisgarh.

How big is it?

It has a stated cost of ₹3.8 crore and a site of 30.3 acres.

When was it filed?

The application was filed on 27 Jun 2026.

Project details

Official titleExpansion of Grain Based Distillery Plant from 100 KLD to 300 KLD (300 KLD Bio-Ethanol or 200 KLD Bio-Ethanol + 100 KLD ENA or 100 TPD derivatives i.e Ethyl/ Methyl/ Butyl Acetates, Bio Acetic Acid/ Crotanaldehyde/ Bio Butanol) with Co-generation Power Plant from 3 MW to 12 MW at Village - Dondekala, Tehsil & District – Raipur, Chhattisgarh by M/s Aarti Synergy Private Limited
StatusLapsed
Status since1 Aug 2026
Application filed27 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAarti Synergy Private Limited
Land area30.3 acres (12.3 ha)
Project cost₹3.8 crore
Village / localityDande Kalan
Taluk / tehsilRaipur
DistrictRaipur
StateChhattisgarh
Location fromSite boundary on record
Our referenceWID-CG-03588

In context

219 applications in Raipur since January 2022 are in the same category (Industry): 135 approved, 44 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30.3 acres, this one is larger than 53% of them.

128 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dande Kalan, Raipur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.