Project details
| Official title | Sarseni Guma East Limestone Block (Area 527.522 ha) with Production Capacity 1.6 Million TPA, Topsoil 0.048 Million TPA, OB: 0.241 Million TPA (Total Excavation: 1.889 Million TPA) along with installation of 1 no. x 1.0 MTPA clinker plant and 3 MW waste heat recovery boiler (WHRB) based power plant by M/s. Feegrade & Co Pvt. Ltd. located at Villages: Amlidih, Gitkera, Guma, Saiha & Sarseni, Tehsil: Palari, District: Baloda Bazar – Bhatapara, State : Chhattisgarh |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Nov 2026 |
| Application filed | 26 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Feegrade & Company Private Limited |
| Land area | 1,303.5 acres (527.5 ha) |
| Project cost | ₹655 crore |
| Village / locality | Guma |
| Taluk / tehsil | Palari |
| District | Baloda Bazar |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03691 |
In context
181 applications in Baloda Bazar since January 2022 are in the same category (Mining): 84 approved, 29 filed or under review, and 68 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 1,303.5 acres, this one is larger than 98% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Guma, Palari, Baloda Bazar, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sarseni Guma West Limestone Block (Rated Capacity 1.6 Mtpa) With 2 Nos. X 0.45… — under environmental review, 2.3 km away
- Guma II Limestone Block (ML Area: 249.03 ha) located at Villages: Guma,… — environmental approval granted, 2.5 km away
- Change in Project Configuration Under Clause 7(Ii):kiln-1 Reduced From 4.5 to… — environmental approval granted, 4 km away
- Amendment in Existing Environmental Clearance letter granted vide F. No.… — under environmental review, 4.3 km away
- Proposed Hirmi - II North Limestone Block (Auctioned Block) (Area: 204.326 ha)… — under environmental review, 5.5 km away
- Proposed Hirmi - II North Limestone Block (Auctioned Block) (Area: 204.326 ha)… — cleared for impact study, 5.5 km away
- Karhi–Chandi Limestone Mine (ML Area 225.719 ha) with expansion in limestone… — under environmental review, 5.6 km away
- Amendment in Existing Environmental Clearance Letter granted vide F. No.… — under environmental review, 6.4 km away
More from Feegrade & Company Private Limited in Baloda Bazar
- Greenfield Cement Clinkerisation Plant (4.5 MTPA), Grinding Unit (1.0 MTPA),… — cleared for impact study
- Sarseni Guma West Limestone Block (Rated Capacity 1.6 Mtpa) With 2 Nos. X 0.45… — under environmental review
All 3 Feegrade & Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.