One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12 MTPA by…
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Arcelormittal Nippon Steel India Private Limited |
| Land area | 98.4 acres (39.8 ha) |
| Project cost | ₹2,132.6 crore |
| Village / locality | Kirandul |
| Taluk / tehsil | Kuakonda |
| District | Dakshin Bastar Dantewada |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03739 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 1 Sept 2026 (this page) | More information requested | 98.4 acres | ₹2,132.6 crore |
| Expansion filed 14 Feb 2026 | Environmental approval granted | 98.4 acres | ₹2,132.6 crore |
| Early planning filed 4 May 2025 | Cleared for impact study | 98.4 acres | ₹2,132.6 crore |
In context
55 applications in Dakshin Bastar Dantewada since January 2022 are in the same category (Mining): 26 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 98.4 acres, this one is larger than 62% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Kirandul, Kuakonda, Dakshin Bastar Dantewada, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12… — environmental approval granted, 0 m away
- Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12… — cleared for impact study, 0 m away
- Expansion of Existing Iron Ore Beneficiation Facility for additional 12 MTPA… — under forest review, 1.1 km away
- Expansion of residential towers located at Kirandul Township of NMDC Limited… — under environmental review, 1.2 km away
- Augmentation of Screening Plant and Associated facilities of Bailadila Iron… — environmental approval granted, 1.3 km away
- Augmentation of Screening Plant and associated facilities at Bailadila… — lapsed, 1.3 km away
- Mining project by M/s Super Minerals, Pro- Jovins Pappachan — lapsed, 1.9 km away
- Kirandul Ordinary Stone Quarry — under environmental review, 1.9 km away
More from Arcelormittal Nippon Steel India Private Limited in Dakshin Bastar Dantewada
- Bailadila Block-1A — forest land use approved
- Permission for Exploration & Survey in Bailadila 01-B Iron Ore Block… — forest land use approved
- Expansion of Existing Iron Ore Beneficiation Facility for additional 12 MTPA… — under forest review
- Laying of Iron Ore Pipeline for Pelletization Plant Through Forest Areas of… — in-principle approval, conditions pending
8 Arcelormittal Nippon Steel projects in Dakshin Bastar Dantewada
All 65 Arcelormittal Nippon Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.