Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 14 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Nmdc Limited |
| Land area | 183.5 acres (74.2 ha) |
| Project cost | ₹2,222 crore |
| Village / locality | Perpa |
| Taluk / tehsil | Kuakonda |
| District | Dakshin Bastar Dantewada |
| State | Chhattisgarh |
| Location from | Site area on record |
| Our reference | WID-CG-00484 |
In context
55 applications in Dakshin Bastar Dantewada since January 2022 are in the same category (Mining): 26 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 183.5 acres, this one is larger than 67% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 366.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Perpa, Kuakonda, Dakshin Bastar Dantewada, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Augmentation of Screening Plant and Associated facilities of Bailadila Iron… — environmental approval granted, 50 m away
- Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12… — more information requested, 1.3 km away
- Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12… — environmental approval granted, 1.3 km away
- Expansion of Existing Iron Ore Beneficiation Plant capacity From 8 MTPA to 12… — cleared for impact study, 1.3 km away
- Environmental Clearance of NMDC for expansion of Bailadila Iron Ore Deposit-14… — environmental approval granted, 1.6 km away
- Expansion of residential towers located at Kirandul Township of NMDC Limited… — under environmental review, 1.8 km away
- Change in Land Use Over 2.06 Ha of Already Diverted Forest Land (The Already… — under forest review, 2.2 km away
- Expansion of Existing Iron Ore Beneficiation Facility for additional 12 MTPA… — under forest review, 2.4 km away
More from Nmdc Limited in Dakshin Bastar Dantewada
- Bailadila Iron Ore Mine, Deposit-5 (M.L. Area 540.05 Ha) with expansion in RoM… — cleared for impact study
- Change in Land Use Over 2.06 Ha of Already Diverted Forest Land (The Already… — under forest review
- Change in Land Use Over 7.74 Ha of Already Diverted Forest Land (The Already… — under forest review
- Forest permission for undertaking survey and exploratory drilling at 48.493 Ha… — forest land use approved
- Land Use Change of Infrastructural Facilities Lease of NMDC Limited over… — under forest review
- Change in Land Use of Bailadila Deposit-10 Mining Lease of NMDC Limited over… — under forest review
23 Nmdc projects in Dakshin Bastar Dantewada
All 40 Nmdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.