Project details
| Status | Under forest review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 9 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Nmdc Limited |
| Land area | 2,162 acres (874.9 ha) |
| Forest land | 19.1 acres (7.7 ha) |
| Project cost | ₹1,033.6 crore |
| Village / locality | Bailadila R F |
| Taluk / tehsil | Dantewada |
| District | Dakshin Bastar Dantewada |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03766 |
In context
55 applications in Dakshin Bastar Dantewada since January 2022 are in the same category (Mining): 26 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2,162 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Bailadila R F, Dantewada, Dakshin Bastar Dantewada, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bailadila Iron Ore Mines, Deposit-11 Project of M/s. NMDC Limited for capacity… — cleared for impact study, 0 m away
- Diversion of 692.555 hectare of forest land outside the Bailadila Deposit-5… — under forest review, 1.8 km away
- Diversion of 908.131 Hectare of Forest Land Outside Mining Leases of Bailadila… — lapsed, 2.5 km away
- Change in Land Use Over 2.06 Ha of Already Diverted Forest Land (The Already… — under forest review, 2.6 km away
- Forest permission for undertaking survey and exploratory drilling at 48.493 Ha… — forest land use approved, 3 km away
- Regularization of 4.5 Ha Reserve Forest Land Outside Mine Lease Area of NMDC… — lapsed, 3.5 km away
- Environmental Clearance of NMDC for expansion of Bailadila Iron Ore Deposit-14… — environmental approval granted, 3.6 km away
- Expansion of residential towers located at Kirandul Township of NMDC Limited… — under environmental review, 4.2 km away
More from Nmdc Limited in Dakshin Bastar Dantewada
- Bailadila Iron Ore Mine, Deposit-5 (M.L. Area 540.05 Ha) with expansion in RoM… — cleared for impact study
- Change in Land Use Over 2.06 Ha of Already Diverted Forest Land (The Already… — under forest review
- Forest permission for undertaking survey and exploratory drilling at 48.493 Ha… — forest land use approved
- Land Use Change of Infrastructural Facilities Lease of NMDC Limited over… — under forest review
- Change in Land Use of Bailadila Deposit-10 Mining Lease of NMDC Limited over… — under forest review
- Bailadila Iron Ore Mines, Deposit-11 Project of M/s. NMDC Limited for capacity… — cleared for impact study
23 Nmdc projects in Dakshin Bastar Dantewada
All 40 Nmdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.