Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Nmdc Limited |
| Land area | 5.1 acres (2.1 ha) |
| Forest land | 5.1 acres (2.1 ha) |
| Project cost | ₹1 lakh |
| Village / locality | Bailadila R F |
| Taluk / tehsil | Kuakonda |
| District | Dakshin Bastar Dantewada |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04127 |
In context
55 applications in Dakshin Bastar Dantewada since January 2022 are in the same category (Mining): 26 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 5.1 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.
Where it is
Bailadila R F, Kuakonda, Dakshin Bastar Dantewada, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of NMDC for expansion of Bailadila Iron Ore Deposit-14… — environmental approval granted, 1.3 km away
- Forest permission for undertaking survey and exploratory drilling at 48.493 Ha… — forest land use approved, 2.1 km away
- Expansion of residential towers located at Kirandul Township of NMDC Limited… — under environmental review, 2.1 km away
- Augmentation of Screening Plant and associated facilities at Bailadila… — lapsed, 2.2 km away
- Augmentation of Screening Plant and Associated facilities of Bailadila Iron… — environmental approval granted, 2.2 km away
- Regularization of 4.5 Ha Reserve Forest Land Outside Mine Lease Area of NMDC… — lapsed, 2.3 km away
- Change in Land Use Over 7.74 Ha of Already Diverted Forest Land (The Already… — under forest review, 2.6 km away
- Bailadila Iron Ore Mines, Deposit-11 Project of M/s. NMDC Limited for capacity… — cleared for impact study, 2.6 km away
More from Nmdc Limited in Dakshin Bastar Dantewada
- Bailadila Iron Ore Mine, Deposit-5 (M.L. Area 540.05 Ha) with expansion in RoM… — cleared for impact study
- Change in Land Use Over 7.74 Ha of Already Diverted Forest Land (The Already… — under forest review
- Forest permission for undertaking survey and exploratory drilling at 48.493 Ha… — forest land use approved
- Land Use Change of Infrastructural Facilities Lease of NMDC Limited over… — under forest review
- Change in Land Use of Bailadila Deposit-10 Mining Lease of NMDC Limited over… — under forest review
- Bailadila Iron Ore Mines, Deposit-11 Project of M/s. NMDC Limited for capacity… — cleared for impact study
23 Nmdc projects in Dakshin Bastar Dantewada
All 40 Nmdc projects across India
About this information