One of 2 filings for this project. The project's main page, with every filing and where each stands: Power project by M/S Essar Power Transmission Co. LTD- Modification of 400 KV D/C Mahan…
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 May 2025 |
| Application filed | 17 Dec 2024 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Essar Power Transmission Company Limited |
| Land area | 69.5 acres (28.1 ha) |
| Forest land | 887.5 acres (359.2 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Sasin |
| Taluk / tehsil | Katghora -1 |
| District | Korba |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03845 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 17 Dec 2024 (this page) | Lapsed | 69.5 acres | ₹4.7 crore |
| New project filed 28 Mar 2023 | In-principle approval, conditions pending | 480.4 acres | ₹4.7 crore |
In context
27 applications in Korba since January 2022 are in the same category (Power): 10 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 69.5 acres, this one is smaller than 89% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sasin, Katghora -1, Korba, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power project by M/S Essar Power Transmission Co. LTD- Modification of 400 KV… — in-principle approval, conditions pending, 250 m away
- Matin Ordinary Stone Quarry — lapsed, 4.8 km away
- Diversion of 0.1392 Ha. of Forest Land for Construction of Mobile Tower — lapsed, 6.1 km away
- Reconnaissance Survey for Lithium and Associated Ree-Rm in and Around… — forest land use approved, 8.1 km away
- Reconnaissance Survey for Lithium and Associated Ree-Rm in and Around… — forest land use approved, 8.1 km away
- Validation of Existing EC as per notification S.O. 1530 (E) dated 06.04.2018… — returned to applicant, 11 km away
- Diversion of 0.094 Ha. of Forest Land for Telecom Network Connectivity — under forest review, 12.5 km away
- Vijay Central Coal Mine (underground) of M/s Rungta Sons Private Limited — cleared for impact study, 13.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.