Quick answers
What is this project?
Proposed Forest Diversion for of Proposed Approach Road From National Highway to Parsa Coal Mine Area Required 0.250 Ha. of Ramanujanagar Range, Surajpur Division, Chattisgarh is an approved road project in Pidiya R F, Premnagar, Surajpur, Chhattisgarh. The site covers 5.1 acres.
Who is building it?
The applicant is Rajasthan Rajya Vidhyut Utpadan Nigam LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 May 2026), as of 27 Nov 2026.
Where is it?
In Pidiya R F, Premnagar, Surajpur, Chhattisgarh.
How big is it?
It has a stated cost of ₹1.6 crore; a site of 5.1 acres and 2,500 m² of forest land.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 May 2026 |
| Application filed | 3 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rajasthan Rajya Vidhyut Utpadan Nigam LTD |
| Land area | 5.1 acres (2.1 ha) |
| Forest land | 2,500 m² |
| Project cost | ₹1.6 crore |
| Village / locality | Pidiya R F |
| Taluk / tehsil | Premnagar |
| District | Surajpur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03898 |
In context
10 applications in Surajpur since January 2022 are in the same category (Roads & highways): 1 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Pidiya R F, Premnagar, Surajpur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Proposed Integrated Coal to Chemicals & Petrochemical based Products" by CG… — returned to applicant, 7.9 km away
- 6 MW Gej Hydro Power Project of Saffire Bio Energy LLP — lapsed, 20.8 km away
- Sandeep Kumar Agrawal — environmental approval granted, 28.7 km away
- Sandeep Kumar Agrawal — lapsed, 28.7 km away
- Amgaon Opencast Coal Mining Project — more information requested, 31.2 km away
- Ketki Expansion Underground Mine (Mdo Mode) — under environmental review, 31.2 km away
- Ketki Expansion Underground Mine (Mdo Mode) — returned to applicant, 31.2 km away
- Ketki Expansion Underground Mine (Mdo Mode) — cleared for impact study, 31.2 km away
All 13 Rajasthan Rajya Vidhyut Utpadan Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.