One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Pipe Line for Chhotedongar Iron Ore Mine area 0.41 hectare Detail
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Sept 2024 |
| Application filed | 30 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Jayaswal Neco Industries Limited |
| Land area | 4.1 acres (1.6 ha) |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Chhota Dongar R F |
| Taluk / tehsil | Narayanpur |
| District | Narayanpur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03989 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2024 | Lapsed | 4.1 acres | ₹2.3 crore |
| New project filed 30 May 2024 (this page) | Lapsed | 4.1 acres | ₹2 crore |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhota Dongar R F, Narayanpur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Pipe Line for Chhotedongar Iron Ore Mine area 0.41 hectare Detail — lapsed, 150 m away
- Laying of Pipe Line for Chhotedongar Iron Ore Mine Over an Area of 0.406 Ha of… — forest land use approved, 200 m away
- Enhancement of Iron Ore Mining Capacity from the present 2.95 MTPA to 6.00… — environmental approval granted, 2 km away
- Enhancement of Iron Ore Mining Capacity from the present 2.95 MTPA to 6.00… — cleared for impact study, 2 km away
- Badgaon-Dhurbeda-Tadonar to Narayanpur (Village Road) Length 21.00km — lapsed, 9.4 km away
- Bharatnet Project PhaseII Narayanpur forest Division — lapsed, 10.7 km away
- JIO DIGITAL FIBRE PRIVATE LIMITED, Narayanpur ForestDivision, Laying of OFC — lapsed, 17.5 km away
- JIO DIGITAL FIBRE PRIVATE LIMITED, Narayanpur Forest Division, Laying of OFC — lapsed, 19.3 km away
More from Jayaswal Neco Industries Limited in Narayanpur
- Enhancement of Iron Ore Mining Capacity from the present 2.95 MTPA to 6.00… — environmental approval granted
- Laying of Pipe Line for Chhotedongar Iron Ore Mine Over an Area of 0.406 Ha of… — forest land use approved
- Enhancement of Iron Ore Mining Capacity from the present 2.95 MTPA to 6.00… — cleared for impact study
5 Jayaswal Neco Industries projects in Narayanpur
All 12 Jayaswal Neco Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.