Quick answers
What is 24.90 MW Jelha Small Hydro Electric Project?
24.90 MW Jelha Small Hydro Electric Project is a building project in Reserved Forest, Oudgi, Surajpur, Chhattisgarh. The site covers 235.5 acres.
Who is building it?
The applicant is Chhattisgarh Hydro Power LLP.
Has it been approved?
Yes. Its status is “Decision issued” (since 16 May 2026), as of 27 Nov 2026.
Where is it?
In Reserved Forest, Oudgi, Surajpur, Chhattisgarh.
How big is it?
It has a stated cost of ₹360 crore and a site of 235.5 acres.
When was it filed?
The application was filed on 16 May 2026.
Project details
| Status | Decision issued |
|---|---|
| Status since | 16 May 2026 |
| Application filed | 16 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Chhattisgarh Hydro Power LLP |
| Land area | 235.5 acres (95.3 ha) |
| Project cost | ₹360 crore |
| Village / locality | Reserved Forest |
| Taluk / tehsil | Oudgi |
| District | Surajpur |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04302 |
In context
5 applications in Surajpur since January 2022 are in the same category (Buildings & townships): 1 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Reserved Forest, Oudgi, Surajpur, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Erection of 11 KV Line at Village - Khod — more information requested, 10.7 km away
- Project for Erection of 11 KV Line at Village - Khod — more information requested, 10.9 km away
- PMGSY Road L311-Odgi Nawatola Road Km. 8.20 To Ghuidih Pandopara — under wildlife review, 12 km away
- PMGSY Road L311-Odgi Nawatola Road Km. 8.20 To Ghuidih Pandopara — not approved, 12 km away
- Bsnl 4g Saturation Project — lapsed, 13.7 km away
- Gandhwani Pumped Storage Project (1200 MW) — cleared for impact study, 16.2 km away
- Bsnl 4g Saturation Project-Village-Pendari, Vill Code-432188 — lapsed, 17.6 km away
- Chikni Pumped Storage Project — cleared for impact study, 17.8 km away
More from Chhattisgarh Hydro Power LLP in Surajpur
- 132KV DCSS line from CSPTCL's 220/132 KV S/s Bishrampur to proposed Switchyard… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.