Quick answers
What is this project?
Proposed 4800 (6x800) MW Coal Based Ultra Super-Critical Thermal Power Project at Salka, Kathmunda, Narayanpur, Mudgaon and adjacent villages, Tehsil/ Block Premnagar and Udaypur, District Surguja and Surajpur, Chhattisgarh by Adani Power Limited is a proposed building project in Kathmunda, Udaypur, Surguja, Chhattisgarh. The site covers 1,664.3 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kathmunda, Udaypur, Surguja, Chhattisgarh.
How big is it?
It has a stated cost of ₹56,030 crore; a site of 1,664.3 acres and 644.3 acres (260.7 ha) of forest land.
When was it filed?
The application was filed on 6 Nov 2026.
In depth: Adani Power Proposes a 4,800-MW Thermal Plant in Surguja and Surajpur, Chhattisgarh — every filing for this project and where each stands.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 6 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Power Limited |
| Land area | 1,664.3 acres (673.5 ha) |
| Forest land | 644.3 acres (260.7 ha) |
| Project cost | ₹56,030 crore |
| Village / locality | Kathmunda |
| Taluk / tehsil | Udaypur |
| District | Surguja |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-04374 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2026 (this page) | More information requested | 1,664.3 acres | ₹56,030 crore |
| Early planning filed 17 Sept 2026 | Under environmental review | 1,664.3 acres | ₹56,030 crore |
Where it is
Kathmunda, Udaypur, Surguja, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 4800 (6x800) MW Coal Based Ultra Super-Critical Thermal Power Project… — under environmental review, 0 m away
- Diversion of 12.365 Ha (1.002 Ha Revenue Forest and 11.363 Ha Protected Forest… — under forest review, 10.8 km away
- Diversion of 11.916 Ha (1.308 Ha Revenue Forest and 10.608 Ho Protected Forest… — lapsed, 10.8 km away
- Expansion of Parsa East and Kanta Basan (PEKB) Opencast Coal Mine from 18 MTPA… — lapsed, 11.9 km away
- Expansion of Parsa East and Kanta Basan (PEKB) Opencast Coal Mine from 18 MTPA… — withdrawn, 11.9 km away
- Amendment of Condition in Parsa East and Kanta Basan (PEKB) Opencast Coal Mine… — environmental approval granted, 11.9 km away
- Amendment of Condition in Parsa East and Kanta Basan (PEKB) Opencast Coal Mine… — environmental approval granted, 11.9 km away
- Amendment of Condition in Parsa East and Kanta Basan Pit Head Coal Washery at… — environmental approval granted, 11.9 km away
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.