Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 29 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | All India Institute of Ayurveda |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹369 crore |
| Village / locality | Molar Band |
| Taluk / tehsil | Sarita Vihar |
| District | South East |
| State | Delhi |
| Location from | Site boundary on record |
| Our reference | WID-DL-00030 |
In context
28 applications in South East since January 2022 are in the same category (Buildings & townships): 14 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is larger than 79% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Molar Band, Sarita Vihar, South East, Delhi. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "IT-ITES Building" Project — under environmental review, 1.3 km away
- Proposed IT/ITES Building At Plot No. 37, Block A, Mohan Cooperative… — environmental approval granted, 1.3 km away
- "Warehouse project" located at F-82, Okhla Industrial Area, Okhla Phase-I,… — environmental approval granted, 1.7 km away
- "Proposed Expansion of Existing Waste to Energy Plant up to 45 MW", at… — environmental approval granted, 1.9 km away
- "Proposed Expansion of Existing Waste to Energy Plant up to 45 MW", at… — withdrawn, 1.9 km away
- "Proposed Expansion of Existing Waste to Energy Plant up to 45 MW", at… — cleared for impact study, 1.9 km away
- Proposed Group Housing Project Located at Plot No 82, Block No. B-Ii, Mohan… — environmental approval granted, 1.9 km away
- Proposed Group Housing Project Located at Plot No 82, Block No. B-Ii, Mohan… — cleared for impact study, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.