What is Developing? Open the mapMap

Environmental approval grantedPower · South East, Delhi

"Proposed Expansion of Existing Waste to Energy Plant up to 45 MW", at adjacent DTC Tehkhand Depot, Maa Anandmai Marg, New Delhi-110020 by M/s Tehkhand Waste to Electricity Project Limited

"Proposed Expansion of Existing Waste to Energy Plant up to 45 MW", at adjacent DTC Tehkhand Depot, Maa Anandmai Marg, New Delhi-110020 by M/s Tehkhand Waste to Electricity Project Limited is an approved power project in Tehkhand, Kalkaji, South East, Delhi. The site covers 15 acres. Its stated project cost is ₹900 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Jun 2026).

See it on the live map All projects in South East

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since4 Jun 2026
Application filed1 Mar 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorPower
ApplicantTehkhand Waste to Electricity Project Limited
Land area15 acres (6.1 ha)
Project cost₹900 crore
Village / localityTehkhand
Taluk / tehsilKalkaji
DistrictSouth East
StateDelhi
Location fromSite boundary on record
Our referenceWID-DL-00164

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 1 Mar 2026 (this page)Environmental approval granted15 acres₹900 crore
Early planning filed 7 Aug 2025Withdrawn15 acres₹900 crore
Early planning filed 21 Jul 2025Cleared for impact study15 acres₹900 crore

In context

23 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tehkhand, Kalkaji, South East, Delhi. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Tehkhand Waste to projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.