Quick answers
What is this project?
Expansion of Waste to Energy Plant from 24 MW to 60 MW by M/s. Delhi MSW Solutions Ltd. (DMSWSL) is a lapsed power project in Bawana, Narela, North, Delhi. The site covers 17.2 acres.
Who is building it?
The applicant is Delhi Msw Solutions Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Bawana, Narela, North, Delhi.
How big is it?
It has a stated cost of ₹1,278.1 crore and a site of 17.2 acres.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Official title | Expansion of Waste to Energy Plant from 24 MW to 60 MW by M/s. Delhi MSW Solutions Ltd. (DMSWSL) at Tehsil Narela, District North West, Delhi |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 10 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Delhi Msw Solutions Limited |
| Land area | 17.2 acres (7 ha) |
| Project cost | ₹1,278.1 crore |
| Village / locality | Bawana |
| Taluk / tehsil | Narela |
| District | North |
| State | Delhi |
| Location from | Site boundary on record |
| Our reference | WID-DL-00032 |
In context
8 applications in North since January 2022 are in the same category (Power): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bawana, Narela, North, Delhi. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Treatment Storage Disposal Facility" at Plot No. N1, Sector 5 Bawana… — environmental approval granted, 250 m away
- Construction of Rithala - Kundli Metro Corridor Of DMRC Phase- IV MRTS — forest land use approved, 2 km away
- Removal of LILO of Bawana- Mandola 400kV D/C line at Maharanibagh S/S and… — forest land use approved, 2.6 km away
- Proposed Waste to Energy Project 50 MW, DSIIDC Industrial Area, sector-5,… — cleared for impact study, 3.2 km away
- Ewaste Ecopark - 2 — lapsed, 3.3 km away
- Noc for tree cutting at Railway Land Parcel at Ashok Vihar, Delhi, Village-… — not approved, 3.5 km away
- Proposed Waste to Energy Project 50 MW, DSIIDC Industrial Area, sector-5,… — environmental approval granted, 5.3 km away
- New Building at Plot No. 2, FC-5, Block A, Sector-28, Rohini, Delhi — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.