Removal of LILO of Bawana- Mandola 400kV D/C line at Maharanibagh S/S and Extension of above LILO section from Maharanibagh upto Narela S/S so as to form 2X400kVD/C Maharanibagh- Narela line on Multicircuit tower using Twin HTLS conductor (RTM-Part G1) is an approved power project in Tikri Khurd, Narela, North, Delhi. The site covers 42.4 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Apr 2026), as of 27 Nov 2026.
Where is it?
In Tikri Khurd, Narela, North, Delhi.
How big is it?
It has a stated cost of ₹333.1 crore; a site of 42.4 acres and 12.8 acres (5.2 ha) of forest land.
When was it filed?
The application was filed on 17 Dec 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Apr 2026 |
| Application filed | 17 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 42.4 acres (17.2 ha) |
| Forest land | 12.8 acres (5.2 ha) |
| Project cost | ₹333.1 crore |
| Village / locality | Tikri Khurd |
| Taluk / tehsil | Narela |
| District | North |
| State | Delhi |
| Location from | Site boundary on record |
| Our reference | WID-DL-00213 |
In context
8 applications in North since January 2022 are in the same category (Power): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tikri Khurd, Narela, North, Delhi. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Rithala - Kundli Metro Corridor Of DMRC Phase- IV MRTS — forest land use approved, 1.3 km away
- Noc for tree cutting at Railway Land Parcel at Ashok Vihar, Delhi, Village-… — not approved, 2.1 km away
- Expansion of Waste to Energy Plant from 24 MW to 60 MW by M/s. Delhi MSW… — lapsed, 2.6 km away
- Ewaste Ecopark - 2 — lapsed, 2.7 km away
- "Treatment Storage Disposal Facility" at Plot No. N1, Sector 5 Bawana… — environmental approval granted, 2.8 km away
- Environment Clearance for Proposed Addition / Alteration in Maha Laxmi Castle… — environmental approval granted, 5.8 km away
- Proposed Waste to Energy Project 50 MW, DSIIDC Industrial Area, sector-5,… — cleared for impact study, 5.8 km away
- Proposed Waste to Energy Project 50 MW, DSIIDC Industrial Area, sector-5,… — environmental approval granted, 6.6 km away
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.