Quick answers
What is this project?
This approved industrial building project by M/s. R. R. Kabel Limited, (Unit-3) is in Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 8.8 acres.
Who is building it?
The applicant is R R Kabel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹270.7 crore and a site of 8.8 acres.
When was it filed?
The application was filed on 3 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 3 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | R R Kabel Limited |
| Use | Industrial |
| Land area | 8.8 acres (3.6 ha) |
| Project cost | ₹270.7 crore |
| Village / locality | Saili |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00027 |
In context
52 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Buildings & townships): 27 approved, 12 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.8 acres, this one is larger than 73% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by Ram Ratna Wires Limited — lapsed, 200 m away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — environmental approval granted, 800 m away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — cleared for impact study, 800 m away
- Set up Gas Distribution Network in Dadra and Nagar Haveli Geographical Area (GA) — under wildlife review, 800 m away
- Industrial project by M/s. Madelin Enterprises Pvt. Ltd. — environmental approval granted, 900 m away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — environmental approval granted, 1.4 km away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — lapsed, 1.4 km away
- Diversion of Forest land for the Laying of Underground Drinking Water Pipeline… — under wildlife review, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.