Quick answers
What is Building project by Ram Ratna Wires Limited?
This lapsed building project by Ram Ratna Wires Limited is in Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 7.3 acres.
Who is building it?
The applicant is Ram Ratna Wires Limited.
Has it been approved?
No. The application was lapsed on 26 Nov 2026, so it is no longer under consideration.
Where is it?
In Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹226.8 crore and a site of 7.3 acres.
When was it filed?
The application was filed on 30 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 30 May 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ram Ratna Wires Limited |
| Land area | 7.3 acres (3 ha) |
| Project cost | ₹226.8 crore |
| Village / locality | Saili |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00074 |
In context
52 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Buildings & townships): 27 approved, 12 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.3 acres, this one is larger than 65% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saili, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. R. R. Kabel Limited, (Unit-3) — environmental approval granted, 200 m away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — environmental approval granted, 650 m away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — cleared for impact study, 650 m away
- Set up Gas Distribution Network in Dadra and Nagar Haveli Geographical Area (GA) — under wildlife review, 650 m away
- Industrial project by M/s. Madelin Enterprises Pvt. Ltd. — environmental approval granted, 800 m away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — environmental approval granted, 1.3 km away
- Industrial project by M/s. Unify Texturisers Pvt. Ltd. — lapsed, 1.3 km away
- Expansion of Factory Building by Blue Star Limited. — environmental approval granted, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.