What is this project?
Diversion of Reserved Forest Land for LT Electric Connection to USO 4G BSNL Tower sites in Goratpada, Mandoni and Ghodbari in RF area under GOI Saturation Project in Dadra & Nagar Haveli is an approved power project in Mandoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 Aug 2026), as of 27 Nov 2026.
Where is it?
In Mandoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0.1 acres and 400 m² of forest land.
When was it filed?
The application was filed on 8 Jun 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 Aug 2026 |
| Application filed | 8 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mahesh Nair |
| Land area | 400 m² |
| Forest land | 400 m² |
| Project cost | ₹1 lakh |
| Village / locality | Mandoni |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00108 |
In context
18 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Power): 7 approved, 2 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.1 acres, this one is smaller than 94% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mandoni, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Reserved Forest Land for the Improvement of the Geometrical Curve… — forest land use approved, 1 km away
- Diversion of Reserved Forest Land for the Approach Road from Khanvel- Mandoni… — lapsed, 3.6 km away
- Building project by Hindalco Industries Limited — environmental approval granted, 3.8 km away
- Diversion of Reserved Forest Land for the Up-gradation and Widening of the… — forest land use approved, 4.3 km away
- Diversion of Reserve Forest land for the Construction of an approach road from… — not approved, 4.7 km away
- Diversion of Forest Land (PF & RF) for the Construction of Retaining Wall for… — lapsed, 5 km away
- Dadra Nagar Havelli 4G Sat USOF — lapsed, 5 km away
- Dadra Nagar Havelli 4G Sat USO — forest land use approved, 5 km away
More from Mahesh Nair in Dadra & Nagar Haveli
- Amended Bharat Net/BSNL Linear UG OFC laying Project in DNH BLOCK — under wildlife review
- Amanded Bharatnet project Phase-III Underground OFC laying — lapsed
- Dadra Nagar Havelli 4G Sat USOF 2 — lapsed
- Dadra Nagar Havelli 4G Sat USO — forest land use approved