Quick answers
What is this project?
Amended Bharat Net/BSNL Linear UG OFC laying Project in DNH BLOCK is a proposed telecom project in Khuntli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 0.8 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Khuntli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹6 lakh and a site of 0.8 acres.
When was it filed?
The application was filed on 13 Aug 2026.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 13 Aug 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 3,100 m² |
| Project cost | ₹6 lakh |
| Village / locality | Khuntli |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00174 |
In context
5 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khuntli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. R. R. Kabel Limited, (Unit-3) — environmental approval granted, 1.9 km away
- Building project by Ram Ratna Wires Limited — lapsed, 2.1 km away
- Diversion of Forest land for the Laying of Underground Drinking Water Pipeline… — lapsed, 2.2 km away
- Diversion of Forest land for the Laying of Underground Drinking Water Pipeline… — under wildlife review, 2.2 km away
- Industrial project by M/s. Madelin Enterprises Pvt. Ltd. — environmental approval granted, 2.6 km away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — environmental approval granted, 2.7 km away
- Natural Gas Distribution pipeline Networks by M/s. Gujarat Gas Limited at… — cleared for impact study, 2.7 km away
- Set up Gas Distribution Network in Dadra and Nagar Haveli Geographical Area (GA) — under wildlife review, 2.7 km away
More from Mahesh Nair in Dadra & Nagar Haveli
- Amanded Bharatnet project Phase-III Underground OFC laying — lapsed
- Diversion of Reserved Forest Land for LT Electric Connection to USO 4G BSNL… — forest land use approved
- Dadra Nagar Havelli 4G Sat USOF 2 — lapsed
- Dadra Nagar Havelli 4G Sat USO — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.