Quick answers
What is this project?
Diversion of Forest Land (WLS) for Widening and Strengthening of Road Stretch at Dapada and Khadoli Satmalia(Ch. 23/7 to 25/4) , Surangi (Ch. 28/0 to 28/2) under NH 848A is a proposed road project in Khadoli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The site covers 9.4 acres.
Who is building it?
The applicant is Mayank Rana.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Khadoli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu.
How big is it?
It has a stated cost of ₹45 crore and a site of 9.4 acres.
When was it filed?
The application was filed on 20 May 2024.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 20 May 2024 |
| Application filed | 20 May 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mayank Rana |
| Land area | 9.4 acres (3.8 ha) |
| Project cost | ₹45 crore |
| Village / locality | Khadoli |
| Taluk / tehsil | Dadra & Nagar Haveli |
| District | Dadra & Nagar Haveli |
| State | Dadra and Nagar Haveli and Daman and Diu |
| Location from | Site boundary on record |
| Our reference | WID-DN-00169 |
In context
24 applications in Dadra & Nagar Haveli since January 2022 are in the same category (Roads & highways): 5 approved, 7 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 3.2 years from filing to approval. At 9.4 acres, this one is larger than 82% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khadoli, Dadra & Nagar Haveli, Dadra and Nagar Haveli and Daman and Diu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gas Distribution Network in DNH GA (Vasona Char Rasta to Khanvel Petrol Pump… — forest land use approved, 350 m away
- Diversion of Forest Land for the laying of Underground 11 KV Electric Feeder… — lapsed, 750 m away
- Diversion of Protected Forest Land for the Laying of Underground 11KV Electric… — lapsed, 750 m away
- Diversion of Forest Land for the Laying of Underground 11KV Electric Feeder… — lapsed, 750 m away
- Mining project by Shri Shyam Infrsolutions Pvt. Ltd. — lapsed, 1.5 km away
- Mining project by Shri Shyam Infrasolutions Pvt. Ltd. — lapsed, 1.5 km away
- Mining project by Shri Shyam Infrasolutions Pvt. Ltd. — lapsed, 1.5 km away
- Himalaya Infra — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.