Project details
| Status | Not approved |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kiran Dhondopant Thakur |
| Use | Mixed use |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹74.4 crore |
| Village / locality | Ella |
| Taluk / tehsil | Tiswadi |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00082 |
In context
74 applications in North Goa since January 2022 are in the same category (Buildings & townships): 39 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 11.4 acres, this one is larger than 77% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ella, Tiswadi, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential-cum-Commercial Complex situated on land bearing Survey Nos. 60/5,… — environmental approval granted, 0 m away
- Expansion of industrial building by M/S .Funskool (india) Ltd. — lapsed, 1.2 km away
- Residential Cum Commercial Project "Chamunda River Park" located at Survey no.… — lapsed, 3.6 km away
- Residential cum Commercial Project on plot bearing Survey No. 291/1-A (Part)… — environmental approval granted, 4 km away
- "Residential cum Commercial Project" on Plot bearing Survey no. 21/2-A-3,… — lapsed, 4 km away
- "Residential cum Commercial Project" on Plot bearing Survey no. 21/2-A-3,… — lapsed, 4 km away
- Extension of validity of Environment Clearance for Basalt Stone Quarry bearing… — environmental approval granted, 4.6 km away
- Extension of validity of Environment Clearance for Basalt Stone Quarry bearing… — lapsed, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.