Residential Cum Commercial Project "Chamunda River Park" located at Survey no. 51 ,Tivrem village, Ponda Taluka, Goa

Residential Cum Commercial Project "Chamunda River Park" located at Survey no. 51 ,Tivrem village, Ponda Taluka, Goa is a lapsed building project in Tivren, Ponda, North Goa, Goa. The site covers 7.1 acres. Its stated project cost is ₹67.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 31 Jul 2026).

See it on the live map All projects in North Goa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since31 Jul 2026
Application filed11 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantScholar Builders Private Limited
Land area7.1 acres (2.9 ha)
Project cost₹67.6 crore
Village / localityTivren
Taluk / tehsilPonda
DistrictNorth Goa
StateGoa
Location fromSite boundary on record
Our referenceWID-GA-00148

What the filings say

What is planned

Scholar Builders Private Limited proposes to expand the existing "Chamunda River Park," a residential-cum-commercial development in Tivrem. The project originally comprised a built-up area of 19,960.15 square metres, which did not require environmental clearance. The proposed expansion will add 17,628.88 square metres, bringing the total built-up area to 36,303.14 square metres on a plot of 2.87 hectares (7.09 acres).

The completed portion of the project includes Blocks A1, A2, B1, B2, and E2, which have already received occupancy certificates. The expansion involves the construction of 10 new blocks (A6 to A8, B3, C1 to C4, D1, and D2), the addition of a second floor to blocks E1 and E2, and a first floor for the club house.

Upon completion, the project will provide a total of 288 residential units and 37 retail shops. The residential units are a mix of 2BHK, 3BHK, and studio apartments. The buildings are generally designed with a stilt level for parking followed by four floors (Upper Ground plus three floors), reaching a maximum height of approximately 13 metres for the commercial blocks.

ItemDetail
Total Built-up Area36,303.14 m²
Existing Built-up Area18,674.26 m²
Proposed Expansion Area17,628.88 m²
Residential Units288
Commercial Units (Shops)37
Total Occupancy2,087 persons
Fresh Water Requirement184 KLD
Total Parking318 cars

Layout and design

The project layout is designed with a net effective plot area of 2.73 hectares (6.75 acres). Approximately 18.74% of the plot, or 5,375.97 square metres, is dedicated to landscaping and greenbelt development. This includes 3,720.74 square metres of designated open space.

Internal traffic is managed through 6-metre and 8-metre wide internal roads. Parking is distributed between stilt levels for residential blocks and surface parking for the commercial blocks (E1 and E2), providing a total of 318 car spaces. The site features a clubhouse of 162.98 square metres and a swimming pool of 150 square metres.

Land and surroundings

The project is located at Survey No. 51 in Tivrem village, Ponda. The land is situated within a Settlement Zone. According to the applicant's report, a portion of the property boundary abuts a riverbank and is affected by a No Development Zone (NDZ); however, no construction is proposed within this zone.

Environmental sensitivities in the vicinity include the Cumbarjua Canal (0.06 km), the Mandovi River (2.12 km), and the Dr. Salim Ali Bird Sanctuary (9.73 km). The site is accessible via the 8.5-metre wide Marcel-Banastarim Road.

Water, power and access

The total water requirement for the operational phase is estimated at 184 kilolitres per day (KLD). This includes 133 KLD for domestic use and 11 KLD for swimming pool makeup, sourced from a combination of an existing on-site well, water tankers, and Public Works Department (PWD) supply. An additional 142 KLD of treated water from the on-site sewage plant will be reused for flushing (31 KLD), landscaping (108 KLD), and plant backwash.

Power will be sourced from the Goa Electricity Department with a total connected load of 800 KVA and a maximum demand of 600 KVA. For backup, the project will use two 62.5 KVA diesel generator sets.

Environmental safeguards

The applicant plans to upgrade the existing 150 KLD Sewage Treatment Plant (STP) to a 200 KLD capacity using Anaerobic Upflow Bio-Reactor and Natural Bio-Reactor technology. Solid waste is estimated at 843 kg/day. Organic waste (337 kg/day) will be processed on-site using an Organic Waste Converter with a 350 kg/day capacity, while inorganic waste (506 kg/day) will be collected by the local Panchayat.

Energy conservation measures include the installation of solar water heaters for all residential blocks. The drainage plan utilizes a stormwater system that discharges into the Cumbarjua Canal, with unlined drains to promote natural infiltration.

Timeline

The applicant expects to complete the construction of the expansion phase by March 2030. Construction is planned to commence immediately after obtaining the necessary environmental clearances.

Residential Cum Commercial Project Chamunda River Park Located site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Residential Cum Commercial Project Chamunda River Park Located: Site plan: building blocks, open spaces, and area statement (preview)🔒 Sign in free to see it
Site plan: building blocks, open spaces, and area statement
Residential Cum Commercial Project Chamunda River Park Located: Layout plan showing project components and internal roads (preview)🔒 Sign in free to see it
Layout plan showing project components and internal roads
Residential Cum Commercial Project Chamunda River Park Located: Location maps: regional context and specific site boundary (preview)🔒 Sign in free to see it
Location maps: regional context and specific site boundary
Residential Cum Commercial Project Chamunda River Park Located: Floor plans for commercial and studio apartment blocks E1 and E2 (preview)🔒 Sign in free to see it
Floor plans for commercial and studio apartment blocks E1 and E2

In context

74 applications in North Goa since January 2022 are in the same category (Buildings & townships): 39 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 7.1 acres, this one is larger than 68% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tivren, Ponda, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.